WELL · 42-485-37648 · DISTRICT 9

Jennings -D- #9

Plugged

Wichita County · Wichita County Regular field  · Vertical

Jennings -D- #9 (API 42-485-37648) is a plugged well in Wichita County, plugged June 18, 2020, last operated by Nortex Production CO. LLC.

The RRC has issued one drilling permit, issued July 27, 1981, permitted to 2,000 ft.

It was permitted by Owens Oil Company and has since transferred to Nortex Production CO. LLC on the wellbore schedule.

Its lease has reported 16K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Nortex Production Co. LLC

Permitted by Owens Oil Company; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Sep 6, 2019 · (940) 782-1064

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNortex Production Co. LLC
Production reportsNortex Production Co., LLCthrough May 2016
Latest permitOwens Oil CompanyJul 27, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Jul 27, 1981
last permit issued
May 10, 2006
completed
16K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 10, 2006
Shut in
—
Plugged
Jun 18, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings -D- O-13-5481Wichita County RegularNortex Production Co., LLC916K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Owens Oil CompanyJan 1993 → Nov 2001
  2. 2Henderson, Sam W.Dec 2001 → Apr 2002
  3. 3Family Oilfield Investments,ltdMay 2002 → Apr 2004
  4. 4H F Production Co., Ltd.Jul 2006 → Feb 2010
  5. 5Nortex Production Co., LLCMar 2010 → May 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
127259-99DrillOwens Oil CompanyJul 27, 1981Jul 27, 1981—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-5481————

Perforations

Perforated and open-hole intervals.

FromToType
1,8221,823Perforated
1,8221,832Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256012.2540 S
2.3751,830——
4.51,8607.87595 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 2007May 12, 2006—
00Oct 23, 1991Oct 7, 1991—
00Aug 1, 1990Sep 18, 1981—
00Jul 24, 1990——
00Jan 12, 1984Sep 18, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.64K
bbl, last 12 reported months
563K
bbl, all reported
May 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074520H-1 InjectionPlugged Jun 24, 20203009001,822–1,832

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,640 · prior 12 36,300(-73%)

02K4K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48537648, documented in the API reference.