WELL · 42-485-37761 · DISTRICT 9

Roller Estate #1F

Plugged

Wichita County · Wichita County Regular field  · Vertical

Roller Estate #1F (API 42-485-37761) is a plugged well in Wichita County, plugged July 20, 2015, last operated by Red River Exploration Inc..

The RRC has issued one drilling permit, issued September 11, 1981, permitted to 1,439 ft.

It was permitted by Landrum Operating CO., Inc. and has since transferred to Red River Exploration Inc. on the wellbore schedule.

Its lease has reported 6.53K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 24 wells, so these are lease totals, not this well alone.

Operator of record

Red River Exploration Inc.

Permitted by Landrum Operating Co., Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 3, 2020 · 8 permits on file · (214) 864-2180

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRed River Exploration Inc.
Production reportsRed River Exploration, Inc.through May 2005
Latest permitLandrum Operating Co., Inc.Sep 11, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,439
total depth, ft
1
permits on file
Sep 11, 1981
last permit issued
Feb 25, 2002
completed
6.53K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 2002
Shut in
—
Plugged
Jul 20, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roller Estate O-13-26505Wichita County RegularRed River Exploration, Inc.246.53K19Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1J.C.L. Production, Inc.Jan 1993 → Aug 2001
  2. 2Red River Exploration, Inc.Jan 2005 → May 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
132999-99DrillLandrum Operating Co., Inc.Sep 11, 1981Sep 11, 1981—1,439

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-26505————

Perforations

Perforated and open-hole intervals.

FromToType
596608Perforated
—608Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256011.7580 S
2.375600——
4.51,2006.75425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 2002Mar 12, 2002—
00Mar 9, 1987Aug 28, 1984—
00Mar 4, 1987——
00Jul 16, 1985Aug 28, 1984—
00Dec 10, 1984Aug 28, 1984—
00Nov 21, 1984——
00Sep 12, 1984——
00Jan 12, 1984Jan 7, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
44.7K
bbl, all reported
May 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052842H-1 InjectionPlugged Aug 26, 201500550–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48537761, documented in the API reference.