WELL · 42-485-37852 · DISTRICT 9
Douglas B #25
Wichita County · Wichita County Regular field · Producing · Vertical
Douglas B #25 (API 42-485-37852) is a well in Wichita County operated by Quatro Oil And Gas Inc., completed December 19, 1981 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 23, 1981, permitted to 1,100 ft.
It was permitted by Douglas Production CO. and has since transferred to Quatro Oil And Gas Inc. on the wellbore schedule.
Its lease has reported 38.2K barrels of oil and 86 mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Douglas Production Co.; the EWA schedule now lists a different operator.
Joshua, TX · P-5 Y, filed Aug 4, 2025 · 136 permits on file · (940) 767-4443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quatro Oil and Gas Inc. |
| Production reports | Quatro Oil and Gas, Inc.through Apr 2026 |
| Latest permit | Douglas Production Co.Oct 23, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,100
- total depth, ft
- 1
- permits on file
- Oct 23, 1981
- last permit issued
- Dec 19, 1981
- completed
- 38.2K
- cumulative oil, bbl
- 86
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 19, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Douglas "B" O-13-5068 | Wichita County Regular | Quatro Oil and Gas, Inc. | 18 | 38.2K | 86 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 275 · prior 12 422(-35%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Douglas Production Co.Jan 1993 → Jan 2000
- 2Swanson, Tommy Oil Co., Inc.Mar 2000 → Jun 2005
- 3Swanson, Tommy Oil Company, Inc.Jul 2005 → Nov 2015
- 4Quatro Oil and Gas, Inc.Dec 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 137742-99 | Drill | Douglas Production Co. | Oct 23, 1981 | Oct 23, 1981 | — | 1,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5068 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,010 | 1,022 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 1,013 | — | — |
| 4.5 | 1,100 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 15, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-37852 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-37852 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48537852, documented in the API reference.