WELL · 42-485-38990 · DISTRICT 9
Waggoner #4
Wichita County · Wichita County Regular field · Vertical
Waggoner #4 (API 42-485-38990) is a plugged well in Wichita County, plugged December 20, 1988, last operated by Larance Engineering Company.
The RRC has issued one drilling permit, issued July 19, 1983, permitted to 1,950 ft.
Completion filings report 4 formation tops, including Cisco, Megargel Lime, Gunsite Lime, Gunsite Sand.
Operator of record
Wichita Falls, TX · P-5 Y, filed Apr 2, 1993 · 49 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Larance Engineering Company |
| Production reports | none |
| Latest permit | Larance Engineering CompanyJul 19, 1983 |
- 1,950
- total depth, ft
- 1
- permits on file
- Jul 19, 1983
- last permit issued
- Oct 22, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 22, 1983
- Shut in
- —
- Plugged
- Dec 20, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 202086-99 | Drill | Larance Engineering Company | Jul 19, 1983 | Jul 19, 1983 | — | 1,950 |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| CiscoCISCO SAND | 1,604 |
| Megargel Lime | 1,816 |
| Gunsite Lime | 1,923 |
| Gunsite Sand | 1,944 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,606 | 1,614 | Perforated |
| 1,618 | 1,624 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 60 | 12.25 | 50 S |
| 4.5 | 1,700 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 1984 | Nov 17, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-38990 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-38990 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48538990, documented in the API reference.