WELL · 42-485-39814 · DISTRICT 9
Waggoner #5
Wichita County · Wichita County Regular field · Vertical
Waggoner #5 (API 42-485-39814) is a plugged well in Wichita County, plugged September 5, 1985, last operated by Larance Engineering Company.
The RRC has issued one drilling permit, issued April 18, 1984, permitted to 2,000 ft.
Completion filings report 2 formation tops, including Cisco, Gunsight.
Operator of record
Wichita Falls, TX · P-5 Y, filed Apr 2, 1993 · 49 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Larance Engineering Company |
| Production reports | none |
| Latest permit | Larance Engineering CompanyApr 18, 1984 |
- 2,000
- total depth, ft
- 1
- permits on file
- Apr 18, 1984
- last permit issued
- Jun 28, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 28, 1984
- Shut in
- —
- Plugged
- Sep 5, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 235929-99 | Drill | Larance Engineering Company | Apr 17, 1984 | Apr 18, 1984 | — | 2,000 |
Formation tops
As filed on W-2/G-1. Subsea from 1,121 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 384 | 390 | Perforated |
| 858 | 863 | Perforated |
| 870 | 874 | Perforated |
| 883 | 888 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 966 | 7.875 | 365 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 1984 | Jul 30, 1984 | — |
| 00 | Aug 11, 1984 | Jul 30, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-39814 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-39814 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48539814, documented in the API reference.