WELL · 42-485-40040 · DISTRICT 9
Goins 2678 #6
Wichita County · Wichita Regular (Gunsight) field · Vertical
Goins 2678 #6 (API 42-485-40040) is a plugged well in Wichita County, plugged April 3, 2001, last operated by Winchester Exploration Inc..
The RRC has issued one drilling permit, issued September 10, 1984, permitted to 1,700 ft.
Completion filings report one formation top, including Gunsight.
Its lease has reported 16.2K barrels of oil and 21 mcf of gas since January 1993, last reporting in August 2003. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Arlington, TX · P-5 Y, filed May 3, 2002 · 11 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Winchester Exploration Inc. |
| Production reports | Winchester Exploration, Inc.through Aug 1999 |
| Latest permit | Winchester Exploration, Inc.Sep 10, 1984 |
- 1,700
- total depth, ft
- 1
- permits on file
- Sep 10, 1984
- last permit issued
- Mar 2, 1992
- completed
- 16.2K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 2, 1992
- Shut in
- —
- Plugged
- Apr 3, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goins 2678 O-13-24875 | Wichita Regular (Gunsight) | Winchester Exploration, Inc. | 4 | 16.2K | 21 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Winchester Exploration, Inc.Jan 1993 → Aug 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 251205-99 | Drill | Winchester Exploration, Inc. | Sep 7, 1984 | Sep 10, 1984 | — | 1,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24875 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,048 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gunsight | 1,598 | -550 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,601 | 1,629 | Perforated |
| 1,640 | 1,650 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 106 | 11 | 55 S |
| 4.5 | 1,682 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 1993 | Jan 25, 1993 | — |
| 00 | Jan 25, 1985 | Dec 27, 1984 | — |
| 00 | Jan 8, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-40040 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-40040 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 518K
- bbl, all reported
- Apr 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000075073 | H-1 Injection | Plugged May 29, 2001 | 600 | 400 | 1,599–1,622 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48540040, documented in the API reference.