WELL · 42-485-40237 · DISTRICT 9

Riley #55

Plugged

Wichita County · Wichita County Regular field  · Vertical

Riley #55 (API 42-485-40237) is a plugged well in Wichita County, plugged September 1, 1987, last operated by Rog Enterprises LLC.

The RRC has issued one drilling permit, issued January 17, 1985, permitted to 650 ft.

It was permitted by Darden, R. W. and has since transferred to Rog Enterprises LLC on the wellbore schedule.

Completion filings report one formation top, including Cisco.

Operator of record

Rog Enterprises LLC

Permitted by Darden, R. W.; the EWA schedule now lists a different operator.

Burkburnett, TX · P-5 Y, filed Mar 4, 2026 · 42 permits on file · (214) 514-6379

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRog Enterprises LLC
Production reportsnone
Latest permitDarden, R. W.Jan 17, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

650
total depth, ft
1
permits on file
Jan 17, 1985
last permit issued
Mar 10, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 1985
Shut in
—
Plugged
Sep 1, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
264339-99DrillDarden, R. W.Jan 16, 1985Jan 17, 1985—650

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Cisco580

Perforations

Perforated and open-hole intervals.

FromToType
581591Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.56456.75105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1985Mar 28, 1985—
00Apr 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48540237, documented in the API reference.