WELL · 42-485-40617 · DISTRICT 9

Rogers W.P. #3

Plugged

Wichita County · Wichita County Regular field  · Vertical

Rogers W.P. #3 (API 42-485-40617) is a plugged well in Wichita County, plugged September 24, 2001, last operated by J.C.L. Production Inc..

The RRC has issued one drilling permit, issued August 26, 1985, permitted to 2,000 ft.

It was permitted by Moore Drilling Corp. and has since transferred to J.C.L. Production Inc. on the wellbore schedule.

Completion filings report one formation top, including Fusilina.

Its lease has reported 574 barrels of oil and 10 mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

J.C.L. Production Inc.

Permitted by Moore Drilling Corp.; the EWA schedule now lists a different operator.

Burkburnett, TX · P-5 Y, filed Jul 3, 2008 · 9 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.C.L. Production Inc.
Production reportsJ.C.L. Production, Inc.through Jun 1998
Latest permitMoore Drilling Corp.Aug 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Aug 26, 1985
last permit issued
Mar 28, 1986
completed
574
cumulative oil, bbl
10
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 1986
Shut in
—
Plugged
Sep 24, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rogers, W.P. O-13-24618Wichita County RegularJ.C.L. Production, Inc.1057410Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Case OilJan 1993 → Oct 1993
  2. 2J.C.L. Production, Inc.Oct 1994 → Jun 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
283460-99DrillMoore Drilling Corp.Aug 26, 1985Aug 26, 1985—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-24618————

Formation tops

As filed on W-2/G-1. Subsea from 1,010 ft elevation.Download CSV →

FormationMD ftSubsea
Fusilina1,181-171

Perforations

Perforated and open-hole intervals.

FromToType
900950Perforated
1,2011,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2366.75200 S
4.51,2536.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 5, 1986Mar 28, 1986Yes
00Apr 22, 1986Apr 1, 1986Yes
00Mar 27, 1986Feb 4, 1986Yes
00Mar 25, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.77K
bbl, all reported
Oct 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058469H-1 InjectionPlugged Oct 30, 200106001,226–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48540617, documented in the API reference.