WELL · 42-485-40762 · DISTRICT 9

Lochridge B #24

Plugged

Wichita County · Wichita Co. Reg. field  · Vertical

Lochridge B #24 (API 42-485-40762) is a plugged well in Wichita County, plugged March 21, 1997, last operated by L 7 Oil CO.

The RRC has issued one drilling permit, issued November 12, 1985, permitted to 1,350 ft.

It was permitted by Loc Mac CO. and has since transferred to L 7 Oil CO on the wellbore schedule.

Operator of record

L 7 Oil Co

Permitted by Loc Mac Co.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLoc Mac Co.Nov 12, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,350
total depth, ft
1
permits on file
Nov 12, 1985
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 21, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
289556-99DrillLoc Mac Co.Oct 21, 1985Nov 12, 1985—1,350

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

12.2K
bbl, last 12 reported months
45.4K
bbl, all reported
Oct 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000059443H-1 InjectionPlugged Mar 21, 19970350695–0

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 12,150

05001K1.5K1994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48540762, documented in the API reference.