WELL · 42-485-41095 · DISTRICT 9
Honaker-Stewart Gotham 1985 #2
Wichita County · Wichita County Regular field · Vertical
Honaker-Stewart Gotham 1985 #2 (API 42-485-41095) is a plugged well in Wichita County, plugged March 20, 2007, last operated by Thor Raymond W. & Assoc. Inc..
The RRC has issued one drilling permit, issued April 7, 1986, permitted to 1,999 ft.
It was permitted by Monroe Well Service, Inc. and has since transferred to Thor Raymond W. & Assoc. Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Thomas Sand, Gunsite Sand.
Its 2 leases have reported 1.75K barrels of oil and 24 mcf of gas since January 1993, last reporting in July 2026. The leases carry 21 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Monroe Well Service, Inc.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Aug 14, 2001 · 38 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Thor Raymond W. & Assoc. Inc. |
| Production reports | T & M Oil Co.through Jun 2000 |
| Latest permit | Monroe Well Service, Inc.Apr 7, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Apr 7, 1986
- last permit issued
- Apr 12, 1986
- completed
- 1.75K
- cumulative oil, bbl
- 24
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 12, 1986
- Shut in
- —
- Plugged
- Mar 20, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 21 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Honaker O-13-17473 | Wichita County Regular | T & M Oil Co. | 21 | 1.75K | 24 | Jan 1993 – Jul 2026 |
| — O-13-26569 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thor,raymond W. & Assoc., Inc.Jan 1993 → Sep 1995
- 2Carroll, Alvis J.Oct 1995 → Jan 1998
- 3Talon Production, Inc.Feb 1998 → Mar 2000
- 4T & M Oil Co.Apr 2000 → Jun 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 300693-99 | Drill | Monroe Well Service, Inc. | Apr 7, 1986 | Apr 7, 1986 | — | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-17473 | — | — | — | — |
| — | — O-13-26569 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,992 | 1,994 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 2,000 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 1992 | Mar 16, 1987 | Yes |
| 00 | Apr 8, 1987 | Mar 16, 1987 | Yes |
| 00 | Apr 2, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-41095 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-41095 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48541095, documented in the API reference.