WELL · 42-485-41493 · DISTRICT 9

Jackson J.L. #9

Plugged

Wichita County · Wichita County Regular field  · Vertical

Jackson J.L. #9 (API 42-485-41493) is a plugged well in Wichita County, plugged November 3, 2003, last operated by R2q Operating LLC.

The RRC has issued one drilling permit, issued August 31, 1987, permitted to 810 ft.

It was permitted by Yarberry, E. E. and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report one formation top, including 700' Sd.

Its lease has reported 14.6K barrels of oil and 84 mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Yarberry, E. E.; the EWA schedule now lists a different operator.

Iowa Park, TX · P-5 Y, filed Jul 4, 2026 · 38 permits on file · (940) 733-8152

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsTxon Partners, LLCthrough Dec 2013
Latest permitYarberry, E. E.Aug 31, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

810
total depth, ft
1
permits on file
Aug 31, 1987
last permit issued
Nov 18, 1987
completed
14.6K
cumulative oil, bbl
84
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 18, 1987
Shut in
—
Plugged
Nov 3, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson, J.L. O-13-16577Wichita County RegularR2Q Operating LLC714.6K84Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Yarberry, E. E.Jan 1993 → Mar 2002
  2. 2Hanaco OperatingOct 2002 → Jun 2004
  3. 3Sissom OilJul 2004 → Jan 2005
  4. 4Finnell Oil Services, Inc.Oct 2005 → Dec 2012
  5. 5Txon Partners, LLCFeb 2013 → Dec 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
335082-99DrillYarberry, E. E.Aug 25, 1987Aug 31, 1987—810

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-16577————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
700' SD710

Perforations

Perforated and open-hole intervals.

FromToType
710719Perforated
733738Perforated
769794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58106.75105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 29, 1987Dec 7, 1987—
00Dec 24, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48541493, documented in the API reference.