WELL · 42-485-41699 · DISTRICT 9
Kempner #6
Wichita County · Wichita County Regular field · Vertical
Kempner #6 (API 42-485-41699) is a plugged well in Wichita County, plugged April 23, 2007, last operated by Muller Oil & Gas.
The RRC has issued one drilling permit, issued April 25, 1988, permitted to 1,000 ft.
It was permitted by Jpr Petroleum Operations, Inc. and has since transferred to Muller Oil & Gas on the wellbore schedule.
Completion filings report one formation top, including Cisco.
Its lease has reported 603 barrels of oil and 37 mcf of gas since January 1993, last reporting in March 2008. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by JPR Petroleum Operations, Inc.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed May 6, 2011
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Muller Oil & Gas |
| Production reports | Muller Oil & Gasthrough Apr 1997 |
| Latest permit | JPR Petroleum Operations, Inc.Apr 25, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- Apr 25, 1988
- last permit issued
- Jul 12, 1988
- completed
- 603
- cumulative oil, bbl
- 37
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 12, 1988
- Shut in
- —
- Plugged
- Apr 23, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kempner O-13-14926 | Wichita County Regular | Muller Oil & Gas | 6 | 603 | 37 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MJB Oil Co.Jan 1993 → Jun 1993
- 2Henderson, Sam W.Jul 1993 → Nov 1994
- 3Roberts, Thomas AllenFeb 1995 → Mar 1995
- 4Muller Oil & GasAug 1996 → Apr 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 345683-99 | Drill | JPR Petroleum Operations, Inc. | Apr 25, 1988 | Apr 25, 1988 | — | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-14926 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 6 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cisco | 182 | -176 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 182 | 192 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 905 | 7.875 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 1988 | Sep 26, 1988 | — |
| 00 | Nov 4, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-41699 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-41699 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48541699, documented in the API reference.