WELL · 42-485-41719 · DISTRICT 9

Prothro #1V

Plugged

Wichita County · Wichita County Regular field  · Vertical

Prothro #1V (API 42-485-41719) is a plugged well in Wichita County, plugged January 27, 1997, last operated by Victory Oil & Gas Inc.

The RRC has issued one drilling permit, issued June 6, 1988, permitted to 1,790 ft.

It was permitted by Victory Oil & Gas Incorporated and has since transferred to Victory Oil & Gas Inc on the wellbore schedule.

Operator of record

Victory Oil & Gas Inc

Permitted by Victory Oil & Gas Incorporated; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitVictory Oil & Gas IncorporatedJun 6, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,790
total depth, ft
1
permits on file
Jun 6, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 27, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
347300-99DrillVictory Oil & Gas IncorporatedJun 2, 1988Jun 6, 1988—1,790

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

144K
bbl, last 12 reported months
581K
bbl, all reported
Oct 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067758H-1 InjectionPlugged Jan 27, 19974302501,610–1,626

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 144,000 · prior 12 144,000(+0%)

05K10K15K19931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48541719, documented in the API reference.