WELL · 42-485-41958 · DISTRICT 9

Heiserman G. #22

Plugged

Wichita County · Wichita County Regular field  · Vertical

Heiserman G. #22 (API 42-485-41958) is a plugged well in Wichita County, plugged March 27, 2014, last operated by Waggoner Operating L.L.C..

The RRC has issued one drilling permit, issued September 25, 1989, permitted to 1,750 ft.

It was permitted by Krot Oil CO. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 17.1K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 19 wells, so these are lease totals, not this well alone.

Operator of record

Waggoner Operating L.L.C.

Permitted by Krot Oil Co.; the EWA schedule now lists a different operator.

Vernon, TX · P-5 Y, filed Feb 4, 2026 · 80 permits on file · (940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsWG Operating, Inc.through Apr 2012
Latest permitKrot Oil Co.Sep 25, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,750
total depth, ft
1
permits on file
Sep 25, 1989
last permit issued
Oct 16, 1989
completed
17.1K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 16, 1989
Shut in
—
Plugged
Mar 27, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heiserman, G. O-13-5669Wichita County RegularWaggoner Operating, L.L.C.1917.1K22Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Primrose Operating CompanyJan 1993 → Sep 1996
  2. 2Witt OperatingOct 1996 → May 1998
  3. 3McDay Energy Corp.Jun 1998 → Jun 2008
  4. 4WG Operating, Inc.Sep 2008 → Apr 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
364175-99DrillKrot Oil Co.Sep 21, 1989Sep 25, 1989—1,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-5669————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
GunsightGUNSIGHT SANDS1,665

Perforations

Perforated and open-hole intervals.

FromToType
1,6651,676Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6936.75230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 1993Oct 6, 1993—
00Nov 30, 1989Nov 3, 1989Yes
00Nov 10, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
720K
bbl, all reported
May 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079320H-1 InjectionPlugged Apr 9, 20143007501,665–1,676

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48541958, documented in the API reference.