WELL · 42-485-42284 · DISTRICT 9
Jennings Estate #12
Wichita County · Wichita County Regular field · Vertical
Jennings Estate #12 (API 42-485-42284) is a plugged well in Wichita County, plugged May 30, 1996, last operated by Craighead Ray.
The RRC has issued one drilling permit, issued December 31, 1990, permitted to 1,999 ft.
Completion filings report one formation top, including Cisco.
Its lease has reported 54 barrels of oil and 17 mcf of gas since January 1993, last reporting in July 1996. The lease carries 12 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Oct 2, 1998 · 32 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Craighead Ray |
| Production reports | Craighead, Raythrough Jul 1995 |
| Latest permit | Craighead, RayDec 31, 1990 |
- 1,999
- total depth, ft
- 1
- permits on file
- Dec 31, 1990
- last permit issued
- Jul 15, 1991
- completed
- 54
- cumulative oil, bbl
- 17
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 15, 1991
- Shut in
- —
- Plugged
- May 30, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jennings Estate O-13-21911 | Wichita County Regular | Craighead, Ray | 12 | 54 | 17 | Jan 1993 – Jul 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Craighead, RayJun 1993 → Jul 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 382827-99 | Drill | Craighead, Ray | Dec 27, 1990 | Dec 31, 1990 | Jan 14, 1991 | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-21911 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,404 | 1,413 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,511 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 1991 | Sep 16, 1991 | Yes |
| 00 | Oct 16, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-42284 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-42284 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48542284, documented in the API reference.