WELL · 42-485-42524 · DISTRICT 9
Sheldon W. J. Etal #3
Wichita County · Wichita County Regular field · Vertical
Sheldon W. J. Etal #3 (API 42-485-42524) is a plugged well in Wichita County, plugged April 7, 2005, last operated by H & W Oil.
The RRC has issued one drilling permit, issued January 30, 1992, permitted to 2,000 ft.
It was permitted by Schalk, Thomas S. and has since transferred to H & W Oil on the wellbore schedule.
Completion filings report one formation top, including Sand.
Its lease has reported 3.43K barrels of oil and 63 mcf of gas since January 1993, last reporting in March 2008. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Schalk, Thomas S.; the EWA schedule now lists a different operator.
Electra, TX · P-5 Y, filed Sep 3, 2004
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | H & W Oil |
| Production reports | H & W Oilthrough Oct 1999 |
| Latest permit | Schalk, Thomas S.Jan 30, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Jan 30, 1992
- last permit issued
- Apr 9, 1992
- completed
- 3.43K
- cumulative oil, bbl
- 63
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 9, 1992
- Shut in
- —
- Plugged
- Apr 7, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheldon, W. J., Etal O-13-5762 | Wichita County Regular | H & W Oil | 3 | 3.43K | 63 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Schalk, Thomas S.Jan 1993 → Jul 1995
- 2Prickett Operating CompanyAug 1996 → Jan 1997
- 3H & W OilMay 1997 → Oct 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 396191-99 | Drill | Schalk, Thomas S. | Jan 27, 1992 | Jan 30, 1992 | Mar 25, 1992 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5762 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,800 | 1,806 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 2,026 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 5, 1992 | Apr 13, 1992 | Yes |
| 00 | Apr 20, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-42524 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-42524 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000067601 | UIC Permit | Plugged Apr 14, 2005 | 35 | 400 | 850–860 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48542524, documented in the API reference.