WELL · 42-485-42621 · DISTRICT 9

Staley-Mangold Unit #124

Plugged

Wichita County · K-M-A field  · Vertical

Staley-Mangold Unit #124 (API 42-485-42621) is a plugged well in Wichita County, plugged July 17, 2023, last operated by Stephens & Johnson Operating CO..

The RRC has issued one drilling permit, issued May 21, 1992, permitted to 4,000 ft.

It was permitted by S & J Operating CO. and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Gunsight, Kma Lime, Goen Lime.

Its lease has reported 1.99M barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 91 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Permitted by S & J Operating Co.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 360 permits on file · (940) 781-1977

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitS & J Operating Co.May 21, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
May 21, 1992
last permit issued
Aug 11, 1992
completed
1.99M
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 11, 1992
Shut in
—
Plugged
Jul 17, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 91 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Staley-Mangold Unit O-13-12565K-M-AStephens & Johnson Operating Co.911.99M19Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 26,755 · prior 12 30,136(-11%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
399395-99DrillS & J Operating Co.May 18, 1992May 21, 1992Jul 16, 19924,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-12565————

Formation tops

As filed on W-2/G-1. Subsea from 1,040 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT LIME1,745-705
Kma Lime3,680-2,640
Goen Lime3,910-2,870

Perforations

Perforated and open-hole intervals.

FromToType
3,7973,829Perforated
3,8433,856Perforated
3,8743,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513312.25100 S
5.53,9857.875210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 30, 2005Jul 1, 2005—
00Nov 6, 1992Oct 7, 1992Yes
00Oct 21, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

257K
bbl, last 12 reported months
4.51M
bbl, all reported
Apr 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079986H-1 InjectionPlugged Aug 9, 20239001,8503,797–3,882

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 256,885 · prior 12 301,616(-15%)

010K20K30K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48542621, documented in the API reference.