WELL · 42-485-42782 · DISTRICT 9
Munger-Hogan Lease #2
Wichita County · Wichita County Regular field · Vertical
Munger-Hogan Lease #2 (API 42-485-42782) is a plugged well in Wichita County, plugged June 1, 2011, last operated by Txon Partners LLC.
The RRC has issued one drilling permit, issued April 6, 1993, permitted to 1,999 ft.
It was permitted by Sep, Inc. and has since transferred to Txon Partners LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Thomas Sand, Gunsight.
Its lease has reported 3.36K barrels of oil and 16 mcf of gas since April 1993, last reporting in December 2015. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Sep, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 7, 2020 · 138 permits on file · (337) 356-8893
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Txon Partners LLC |
| Production reports | Aztel Operating Inc.through Dec 1998 |
| Latest permit | Sep, Inc.Apr 6, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Apr 6, 1993
- last permit issued
- Apr 22, 1993
- completed
- 3.36K
- cumulative oil, bbl
- 16
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Dec 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 22, 1993
- Shut in
- —
- Plugged
- Jun 1, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Munger-Hogan Lease O-13-28555 | Wichita County Regular | Txon Partners, LLC | 2 | 3.36K | 16 | Apr 1993 – Dec 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sep, Inc.May 1993 → Apr 1994
- 2Bud's Drilling Company, Inc.Jun 1994 → Nov 1997
- 3Aztel Operating Inc.Dec 1997 → Dec 1998
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28555 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,024 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas Sand | 1,574 | -550 |
| GunsightGUNSIGHT LIME | 1,742 | -718 |
| GunsightGUNSIGHT SAND | 1,750 | -726 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,576 | 1,580 | Perforated |
| 1,584 | 1,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 65 | 12.25 | 85 S |
| 5.5 | 1,808 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 27, 1993 | May 6, 1993 | Yes |
| 00 | May 17, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-42782 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-42782 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48542782, documented in the API reference.