WELL · 42-485-43444 · DISTRICT 9
Stone #2
Wichita County · Wichita County Regular field · Vertical
Stone #2 (API 42-485-43444) is a well in Wichita County operated by Johnson & Ernst Operating CO., completed July 6, 1999.
The RRC has issued 2 drilling permits between 1998 and 1999, permitted to 2,000 ft.
Completion filings report one formation top, including Cloeman Junction.
Its 2 leases have reported 75.1K barrels of oil and 16 mcf of gas since June 1993, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Dec 15, 2017 · 191 permits on file · (940) 723-8127
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Johnson & Ernst Operating Co. |
| Production reports | Sevenx, LLCthrough Apr 2026 |
| Latest permit | Johnson & Ernst Operating Co.Oct 4, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 2
- permits on file
- Oct 4, 1999
- last permit issued
- Jul 6, 1999
- completed
- 75.1K
- cumulative oil, bbl
- 16
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 6, 1999
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stone O-13-29686 | Jprg (630) | Sevenx, LLC | 9 | 71.9K | 0 | Jul 1999 – Jul 2026 |
| Stone O-13-28583 | Wichita County Regular | Johnson & Ernst Operating Co. | 2 | 3.17K | 16 | Jun 1993 – May 2000 |
Oil, barrels lease total
Last 12 months 14 · prior 12 22(-36%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Johnson & Ernst Operating Co.Jun 1993 → Mar 2018
- 2Slant Operating, LLCApr 2018 → Jan 2020
- 3Sevenx, LLCFeb 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 488017-99 | Field transfer | Johnson & Ernst Operating Co. | Sep 28, 1999 | Oct 4, 1999 | Jun 21, 1999 | 1,972 |
| 481077-99 | Drill | Johnson & Ernst Operating Co. | Nov 23, 1998 | Nov 25, 1998 | Jun 21, 1999 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28583 | — | — | — | — |
| — | — O-13-29686 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,122 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cloeman Junction | 608 | 514 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 627 | 639 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,613 | 6.75 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 5, 1999 | Sep 30, 1999 | — |
| 00 | Oct 29, 1999 | — | — |
| 00 | Aug 6, 1999 | Jul 21, 1999 | Yes |
| 00 | Jul 27, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-43444 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-43444 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48543444, documented in the API reference.