WELL · 42-485-43470 · DISTRICT 9

Stone #3

Plugged

Wichita County · Jprg (630) field  · Vertical

Stone #3 (API 42-485-43470) is a plugged well in Wichita County, plugged June 25, 2021, last operated by Sevenx LLC.

The RRC has issued one drilling permit (amended once), issued August 31, 1999, permitted to 2,000 ft.

It was permitted by Johnson & Ernst Operating CO. and has since transferred to Sevenx LLC on the wellbore schedule.

Completion filings report one formation top, including Coleman Junction.

Its lease has reported 71.9K barrels of oil since July 1999, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Sevenx LLC

Permitted by Johnson & Ernst Operating Co.; the EWA schedule now lists a different operator.

Iowa Park, TX · P-5 Y, filed Oct 4, 2025 · (940) 782-7528

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSevenx LLC
Production reportsSevenx, LLCthrough Apr 2026
Latest permitJohnson & Ernst Operating Co.Aug 31, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
2
permits on file
Aug 31, 1999
last permit issued
Sep 22, 1999
completed
71.9K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 22, 1999
Shut in
—
Plugged
Jun 25, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stone O-13-29686Jprg (630)Sevenx, LLC971.9K0Jul 1999 – Jul 2026

Oil, barrels lease total

Last 12 months 14 · prior 12 22(-36%)

024202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Johnson & Ernst Operating Co.Jul 1999 → Mar 2018
  2. 2Slant Operating, LLCApr 2018 → Jan 2020
  3. 3Sevenx, LLCFeb 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486952-98DrillJohnson & Ernst Operating Co.Sep 28, 1999Aug 31, 1999Sep 16, 19992,000
486952-99DrillJohnson & Ernst Operating Co.Aug 25, 1999Aug 31, 1999—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29686————
—— O-13-29686————

Formation tops

As filed on W-2/G-1. Subsea from 1,119 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction618501

Perforations

Perforated and open-hole intervals.

FromToType
642654Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59566.75175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 2002Mar 19, 2002—
00Apr 4, 2002Oct 28, 1999Yes
00Nov 29, 1999Oct 28, 1999Yes
00Nov 15, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
395K
bbl, all reported
Apr 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091974H-1 InjectionPlugged Jul 1, 20212,500315642–670

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543470, documented in the API reference.