WELL · 42-485-43734 · DISTRICT 9
Waggoner W. T. Estate -A- #23
Wichita County · Wichita County Regular field · Producing · Vertical
Waggoner W. T. Estate -A- #23 (API 42-485-43734) is a well in Wichita County operated by OS&S Operating Inc., completed November 16, 1979 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 4, 1979, permitted to 2,000 ft.
It was permitted by Flusche Oil & Equipment CO. and has since transferred to OS&S Operating Inc. on the wellbore schedule.
Its lease has reported 70.7K barrels of oil and 87 mcf of gas since January 1993, last reporting in July 2026. The lease carries 17 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Flusche Oil & Equipment Co.; the EWA schedule now lists a different operator.
Electra, TX · P-5 Y, filed Apr 4, 2026 · (940) 631-7465
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Os&s Operating Inc. |
| Production reports | Os&s Operating Inc.through Mar 2026 |
| Latest permit | Flusche Oil & Equipment Co.Sep 4, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Sep 4, 1979
- last permit issued
- Nov 16, 1979
- completed
- 70.7K
- cumulative oil, bbl
- 87
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 16, 1979
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waggoner, W. T., Estate -A- O-13-5012 | Wichita County Regular | Os&s Operating Inc. | 17 | 70.7K | 87 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 799 · prior 12 1,271(-37%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Flusche Supply, Inc.Jan 1993 → Feb 1993
- 2Flusche, HerbMar 1993 → Sep 1995
- 3Flusche Properties, L.L.C.Oct 1995 → Jun 2000
- 4Os&s Operating Inc.Jul 2000 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 57062-99 | Drill | Flusche Oil & Equipment Co. | Sep 4, 1979 | Sep 4, 1979 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5012 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,640 | 1,644 | Perforated |
| 1,654 | 1,668 | Perforated |
| 1,678 | 1,687 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 62 | 11.75 | 40 S |
| 4.5 | 1,875 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Dec 27, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-43734 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-43734 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48543734, documented in the API reference.