WELL · 42-485-43769 · DISTRICT 9
McCarty Abl #2L
Wichita County · Wichita County Regular field · Shut IN · Vertical
Mccarty Abl #2L (API 42-485-43769) is a well in Wichita County operated by R2q Operating LLC, completed May 1, 2003 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 17, 2003, permitted to 1,000 ft.
It was permitted by Rock Creek Oil CO. and has since transferred to R2q Operating LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Cicso, Cisco, Gunsigh Lime, Gunsight.
Its lease has reported 179K barrels of oil and 38 mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Rock Creek Oil Co.; the EWA schedule now lists a different operator.
Iowa Park, TX · P-5 Y, filed Jul 4, 2026 · 38 permits on file · (940) 733-8152
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R2Q Operating LLC |
| Production reports | R2Q Operating LLCthrough Sep 2025 |
| Latest permit | Rock Creek Oil Co.Apr 17, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- Apr 17, 2003
- last permit issued
- May 1, 2003
- completed
- 179K
- cumulative oil, bbl
- 38
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 1, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McCarty Abl O-13-5174 | Wichita County Regular | R2Q Operating LLC | 18 | 179K | 38 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 4 · prior 12 157(-97%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hammon PropertiesJan 1993 → Mar 1996
- 2Rock Creek Oil Co.May 1996 → Oct 2007
- 3Texas Energy Operations, LCNov 2007 → Apr 2012
- 4Txon Partners, LLCMay 2012 → Jun 2017
- 5White Knight Production LLCJul 2017 → Jul 2019
- 6R2Q Operating LLCJan 2024 → Sep 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530743-99 | Drill | Rock Creek Oil Co. | Apr 15, 2003 | Apr 17, 2003 | May 1, 2003 | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5174 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 510 | 522 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 570 | 6.75 | 70 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 12, 2025 | Jan 2, 2025 | — |
| 00 | Jun 17, 2004 | Apr 8, 2004 | Yes |
| 00 | May 10, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-43769 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-43769 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48543769, documented in the API reference.