WELL · 42-485-43980 · DISTRICT 9

Mitchell Fee #29

Y

Wichita County · K-M-A field · Injection  · Vertical

Mitchell Fee #29 (API 42-485-43980) is a well in Wichita County operated by Quatro Oil And Gas Inc., completed December 4, 2019 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued January 21, 2005, permitted to 4,500 ft.

Completion filings report 7 formation tops, including Gunsight, Kma Lime, Kma Lm, Kma Sand.

Its lease has reported 826K barrels of oil and 93 mcf of gas since January 1993, last reporting in July 2026. The lease carries 33 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 13.4K barrels injected in the 12 months reported through April 2025.

Operator of record

Quatro Oil and Gas Inc.

Joshua, TX · P-5 Y, filed Aug 4, 2025 · 136 permits on file · (940) 767-4443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleQuatro Oil and Gas Inc.
Production reportsQuatro Oil and Gas, Inc.through Apr 2026
Latest permitQuatro Oil and Gas, Inc.Jan 21, 2005
4,500
total depth, ft
1
permits on file
Jan 21, 2005
last permit issued
Dec 4, 2019
completed
826K
cumulative oil, bbl
93
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 4, 2019
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 33 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mitchell Fee O-13-11451K-M-AQuatro Oil and Gas, Inc.33826K93Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 7,445 · prior 12 8,114(-8%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Oil CompanyJan 1993 → Nov 2000
  2. 2Quatro Oil and Gas, Inc.Dec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556384-99DrillQuatro Oil and Gas, Inc.Jan 18, 2005Jan 21, 2005Mar 21, 20054,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-11451————

Formation tops

As filed on W-2/G-1. Subsea from 1,040 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT LIME1,902-862
GunsightGUNSIGHT LM1,902-862
Kma Lime3,728-2,688
Kma LM3,728-2,688
Kma Sand3,872-2,832
Kma Sd.3,872-2,832
Goen Lime3,956-2,916
Goen LM3,956-2,916

Perforations

Perforated and open-hole intervals.

FromToType
3,8723,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6258012.2560 S
4.54,1357.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 10, 2020Jan 3, 2020—
00Aug 23, 2005Jun 8, 2005Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

13.4K
bbl, last 12 reported months
93.4K
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095776H-1 InjectionActive2001,9003,872–3,882

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,371 · prior 12 8,683(+54%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543980, documented in the API reference.