WELL · 42-485-44035 · DISTRICT 9
McCarty M #1H
Wichita County · K-M-A field · Injection · Vertical
Mccarty M #1H (API 42-485-44035) is a well in Wichita County operated by R2q Operating LLC, completed December 1, 2005 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued August 22, 2005, permitted to 5,000 ft.
It was permitted by Hanaco Operating and has since transferred to R2q Operating LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Kamay Lime, Kamay Zone 1, Kamay Zone 2, Kamay Zone 3.
Its lease has reported 17.5K barrels of oil since December 2005, last reporting in July 2026.
It holds an active disposal or injection permit, with 68.9K barrels injected in the 12 months reported through April 2025.
Operator of record
Permitted by Hanaco Operating; the EWA schedule now lists a different operator.
Iowa Park, TX · P-5 Y, filed Jul 4, 2026 · 38 permits on file · (940) 733-8152
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R2Q Operating LLC |
| Production reports | Texas Energy Operations, LCthrough Jun 2009 |
| Latest permit | Hanaco OperatingAug 22, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Aug 22, 2005
- last permit issued
- Dec 1, 2005
- completed
- 17.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 1, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McCarty M O-13-30531 | K-M-A | R2Q Operating LLC | 1 | 17.5K | 0 | Dec 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hanaco OperatingJan 2006 → Dec 2007
- 2Texas Energy Operations, LCJan 2008 → Jun 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 604874-99 | Drill | Hanaco Operating | Aug 11, 2005 | Aug 22, 2005 | Oct 28, 2005 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30531 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Kamay Lime | 3,600 |
| Kamay Zone 1 | 3,630 |
| Kamay Zone 2 | 3,654 |
| Kamay Zone 3 | 3,690 |
| Going | 3,850 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,594 | 4,040 | Perforated |
| 3,600 | 3,612 | Perforated |
| 3,852 | 3,840 | Perforated |
| 4,032 | 4,040 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 60 | 11 | 60 S |
| 4.5 | 4,154 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 22, 2010 | Dec 18, 2009 | — |
| 00 | Apr 4, 2006 | Dec 16, 2005 | Yes |
| 00 | Jan 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-44035 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-44035 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 68.9K
- bbl, last 12 reported months
- 1.29M
- bbl, all reported
- Apr 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000101034 | H-1 Injection | Active | 1,000 | 1,795 | 3,594–4,040 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 68,887 · prior 12 65,605(+5%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48544035, documented in the API reference.