WELL · 42-485-44076 · DISTRICT 9
Waggoner T. J. & J. L. #47
Wichita County · Wichita County Regular field · Shut IN · Vertical
Waggoner T. J. & J. L. #47 (API 42-485-44076) is a well in Wichita County operated by Rocky Point Oil Inc., completed March 26, 2006 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued March 14, 2006, permitted to 1,999 ft.
Completion filings report 3 formation tops, including 450' Permian Sand, 600' Permian Sand, L. 800' Permian Sand.
Its lease has reported 151K barrels of oil and 385 mcf of gas since January 1993, last reporting in July 2026. The lease carries 30 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Mar 4, 2026 · 34 permits on file · (940) 704-8841
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rocky Point Oil Inc. |
| Production reports | Rocky Point Oil, Inc.through Sep 2025 |
| Latest permit | Rocky Point Oil, Inc.Mar 14, 2006 |
- 1,999
- total depth, ft
- 1
- permits on file
- Mar 14, 2006
- last permit issued
- Mar 26, 2006
- completed
- 151K
- cumulative oil, bbl
- 385
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 26, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 30 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waggoner, T. J. & J. L. O-13-5524 | Wichita County Regular | Rocky Point Oil, Inc. | 30 | 151K | 385 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 161 · prior 12 400(-60%)
Gas, mcf lease total
Last 12 months 5 · prior 12 8(-37%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quatro Oil and Gas, Inc.Jan 1993 → Apr 1999
- 2Rocky Point Oil, Inc.May 1999 → Sep 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 615747-99 | Drill | Rocky Point Oil, Inc. | Mar 13, 2006 | Mar 14, 2006 | Mar 21, 2006 | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5524 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,053 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 450' Permian Sand | 450 | 603 |
| 600' Permian Sand | 600 | 453 |
| L. 800' Permian Sand | 800 | 253 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 812 | 820 | Perforated |
| 848 | 858 | Perforated |
| 885 | 900 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 920 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 15, 2006 | Apr 21, 2006 | Yes |
| 00 | May 17, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-44076 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-44076 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.