WELL · 42-485-44114 · DISTRICT 9

Waggoner T. J. & J. L. #48

Y

Wichita County · Wichita County Regular field · Shut IN  · Vertical

Waggoner T. J. & J. L. #48 (API 42-485-44114) is a well in Wichita County operated by Rocky Point Oil Inc., completed July 14, 2006 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 29, 2006, permitted to 1,999 ft.

Completion filings report 4 formation tops, including 450' Permian Sand, 600 Permian Sand, L 800 Permian Sand, 600permian Sand.

Its lease has reported 151K barrels of oil and 385 mcf of gas since January 1993, last reporting in July 2026. The lease carries 30 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Rocky Point Oil Inc.

Wichita Falls, TX · P-5 Y, filed Mar 4, 2026 · 34 permits on file · (940) 704-8841

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRocky Point Oil Inc.
Production reportsRocky Point Oil, Inc.through Sep 2025
Latest permitRocky Point Oil, Inc.Jun 29, 2006
1,999
total depth, ft
1
permits on file
Jun 29, 2006
last permit issued
Jul 14, 2006
completed
151K
cumulative oil, bbl
385
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 14, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 30 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner, T. J. & J. L. O-13-5524Wichita County RegularRocky Point Oil, Inc.30151K385Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 161 · prior 12 400(-60%)

050100202420252026

Gas, mcf lease total

Last 12 months 5 · prior 12 8(-37%)

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quatro Oil and Gas, Inc.Jan 1993 → Apr 1999
  2. 2Rocky Point Oil, Inc.May 1999 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
621733-99DrillRocky Point Oil, Inc.Jun 28, 2006Jun 29, 2006Jul 12, 20061,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-5524————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
450' Permian Sand450
600 Permian Sand600
L 800 Permian Sand800
450' Permian Sand—
600PERMIAN Sand—
L 800 Permian Sand—

Perforations

Perforated and open-hole intervals.

FromToType
1,3031,308Perforated
1,3261,338Perforated
1,3541,364Perforated
1,3821,387Perforated
1,4661,479Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,5306.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 2014Mar 21, 2012—
00Jun 14, 2007Aug 9, 2006Yes
00Jun 12, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
338K
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104803H-1 InjectionActive6006001,326–1,338

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48544114, documented in the API reference.