WELL · 42-485-44433 · DISTRICT 9

Brannan #38

Y

Wichita County · Wichita County Regular field · Injection  · Vertical

Brannan #38 (API 42-485-44433) is a well in Wichita County operated by R2q Operating LLC, completed July 1, 2010 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 23, 2008, permitted to 2,000 ft.

It was permitted by Texas Energy Operations, LC and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 136K barrels of oil and 37 mcf of gas since January 1993, last reporting in July 2026. The lease carries 29 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 303K barrels injected in the 12 months reported through May 2025.

Operator of record

R2Q Operating LLC

Permitted by Texas Energy Operations, LC; the EWA schedule now lists a different operator.

Iowa Park, TX · P-5 Y, filed Jul 4, 2026 · 38 permits on file · (940) 733-8152

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsR2Q Operating LLCthrough Feb 2026
Latest permitTexas Energy Operations, LCMay 23, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
May 23, 2008
last permit issued
Jul 1, 2010
completed
136K
cumulative oil, bbl
37
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 1, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brannan O-13-17691Wichita County RegularR2Q Operating LLC29136K37Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 209 · prior 12 1,046(-80%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1James, DerylJan 1993 → Jan 1996
  2. 2Case OilFeb 1996 → Apr 2007
  3. 3Case Enterprises, Inc.Apr 1997 → Feb 1999
  4. 4Texas Energy Operations, LCMay 2007 → Dec 2019
  5. 5R2Q Operating LLCJan 2020 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
661401-99DrillTexas Energy Operations, LCMay 7, 2008May 23, 2008Jul 5, 20082,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-17691————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight1,726

Perforations

Perforated and open-hole intervals.

FromToType
1,7261,736Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510712.25125 S
5.51,8507.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 26, 2016Mar 31, 2016—
00Nov 3, 2010Sep 16, 2010—
00Nov 20, 2008Oct 6, 2008Yes
00Nov 6, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

303K
bbl, last 12 reported months
4.19M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101973H-1 InjectionActive9008601,726–1,736

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 303,271 · prior 12 303,451(0%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48544433, documented in the API reference.