WELL · 42-485-45912 · DISTRICT 9
Temple #2
Wichita County · Wichita County Regular field · NO Production · Vertical
Temple #2 (API 42-485-45912) is a plugged well in Wichita County, plugged February 5, 2026, last operated by Ggp Exploration Ltd..
The RRC has issued one drilling permit, issued January 12, 2016, permitted to 1,999 ft.
It was permitted by Rwa, LLC and has since transferred to Ggp Exploration Ltd. on the wellbore schedule.
Completion filings report 10 formation tops, including Cisco, Gunsight, Thomas Sand, Caddo.
Its lease has reported 916 barrels of oil since August 2016, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Rwa, LLC; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Feb 4, 2026 · 5 permits on file · (940) 452-8284
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | GGP Exploration Ltd. |
| Production reports | GGP Exploration, Ltd.through Dec 2021 |
| Latest permit | Rwa, LLCJan 12, 2016 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Jan 12, 2016
- last permit issued
- Mar 8, 2016
- completed
- 916
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2016 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 8, 2016
- Shut in
- —
- Plugged
- Feb 5, 2026
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Temple O-13-33784 | Wichita County Regular | GGP Exploration, Ltd. | 2 | 916 | 0 | Aug 2016 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rwa, LLCOct 2016 → Apr 2021
- 2Fullspike Energy LLCApr 2019 → Aug 2019
- 3GGP Exploration, Ltd.May 2021 → Dec 2021
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-33784 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Cisco | 900 |
| GunsightGUNSIGHT SAND | 1,280 |
| Thomas Sand | 1,400 |
| Caddo | — |
| Conglomerate | — |
| Ellenburger | — |
| KMA | — |
| Mississipian | — |
| Tannehill | — |
| Vogstberger | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,284 | 1,288 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 84 | 12.25 | 75 S |
| 4.5 | 1,672 | 6.75 | 205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 31, 2018 | Jun 2, 2017 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-45912 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-45912 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48545912, documented in the API reference.