WELL · 42-487-32150 · DISTRICT 9

Waggoner A #1

Plugged

Wilbarger County · Wilbarger County Regular field  · Vertical

Waggoner A #1 (API 42-487-32150) is a plugged well in Wilbarger County, plugged July 15, 1997, last operated by Talon Production Inc..

The RRC has issued one drilling permit, issued April 26, 1990, permitted to 1,400 ft.

It was permitted by Crutcher, David F. Inc. and has since transferred to Talon Production Inc. on the wellbore schedule.

Completion filings report one formation top, including Wilbarger Co. Reg.

Operator of record

Talon Production Inc.

Permitted by Crutcher, David F. Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Mar 4, 2016 · 102 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTalon Production Inc.
Production reportsnone
Latest permitCrutcher, David F. Inc.Apr 26, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
1
permits on file
Apr 26, 1990
last permit issued
Jul 1, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1990
Shut in
—
Plugged
Jul 15, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner A O-13-27742Wilbarger County RegularTalon Production, Inc.200Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
372213-99DrillCrutcher, David F. Inc.Apr 16, 1990Apr 26, 1990—1,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27742————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Wilbarger Co. Reg774

Perforations

Perforated and open-hole intervals.

FromToType
774782Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58526.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 1990Jul 19, 1990Yes
00Aug 2, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074707H-1 InjectionPlugged Jul 18, 1997100387774–782

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48732150, documented in the API reference.