WELL · 42-489-00008 · DISTRICT 4
Yturria Cattle Co. -B- #2
Willacy County · LA Sara N. (No. 40-A) field · Vertical
Yturria Cattle CO. -B- #2 (API 42-489-00008) is a plugged well in Willacy County, plugged May 1, 2000, last operated by Maynard Oil CO..
The RRC has issued one drilling permit, issued April 25, 1995, permitted to 6,200 ft.
Completion filings report one formation top, including Frio.
Its 3 leases have reported 61.9K barrels of oil and 61.2K mcf of gas since January 1993, last reporting in May 2002. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Denver, CO · P-5 Y, filed Apr 2, 2004 · 301 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maynard Oil Co. |
| Production reports | Maynard Oil Co.through Dec 1999 |
| Latest permit | Maynard Oil Co.Apr 25, 1995 |
- 6,200
- total depth, ft
- 1
- permits on file
- Apr 25, 1995
- last permit issued
- Jul 5, 1966
- completed
- 61.9K
- cumulative oil, bbl
- 61.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 5, 1966
- Shut in
- —
- Plugged
- May 1, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yturria Cattle Co. -B- O-4-6565 | LA Sara, N. (No. 32 Sd.) | Maynard Oil Co. | 1 | 8.88K | 38 | Jan 1993 – May 2002 |
| Yturria Cattle Co. -B- G-4-40857 | LA Sara, N. (No. 40-A) | Maynard Oil Co. | 1 | 0 | 0 | Jan 1993 – May 2000 |
| Yturria Cattle Co. "B" O-4-12464 | LA Sara (No. 22 Sd.) | Maynard Oil Co. | 1 | 53K | 61.1K | May 1995 – May 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maynard Oil Co.Jan 1993 → Dec 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 435127-99 | Recompletion | Maynard Oil Co. | Apr 24, 1995 | Apr 25, 1995 | Mar 21, 1995 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-40857 | — | — | — | — |
| — | — O-4-6565 | — | — | — | — |
| — | — O-4-12464 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,325 | 5,334 | Perforated |
| — | 6,197 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,129 | 12.25 | — |
| 9.625 | 1,129 | — | — |
| 5.5 | 6,650 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 13, 1995 | May 4, 1995 | Yes |
| 00 | Jun 15, 1995 | — | — |
| 00 | Oct 21, 1987 | Jan 5, 1987 | — |
| 00 | Jan 12, 1984 | Jul 25, 1966 | — |
| 00 | Jan 12, 1984 | Jul 12, 1966 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-00008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-00008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48900008, documented in the API reference.