WELL · 42-489-30036 · DISTRICT 4
Armendaiz et Al. #3
Willacy County · Arroyo Colorado (F-8) field · Vertical
Armendaiz ET AL. #3 (API 42-489-30036) is a plugged well in Willacy County, plugged November 18, 1999, last operated by Mueller Engineering Corp..
The RRC has issued 4 drilling permits between 1992 and 1997, permitted to 4,115 ft.
Completion filings report one formation top, including Miocene (undifferentiated).
Operator of record
Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mueller Engineering Corp. |
| Production reports | Mueller Engineering Corp.through May 1998 |
| Latest permit | Mueller Engineering Corp.Sep 15, 1997 |
- 4,115
- total depth, ft
- 4
- permits on file
- Sep 15, 1997
- last permit issued
- Nov 5, 1970
- completed
- 0
- cumulative oil, bbl
- 302K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 5, 1970
- Shut in
- —
- Plugged
- Nov 18, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 6 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Armendaiz et AL G-4-164666 | Arroyo Colorado (B-4) | Mueller Engineering Corp. | 1 | 0 | 20K | Aug 1997 – Nov 1999 |
| Armendaiz, et AL G-4-142596 | Arroyo Colorado (D-3) | Mueller Engineering Corp. | 1 | 0 | 39.2K | Jan 1993 – Jun 1998 |
| Armendaiz, et AL G-4-149278 | Arroyo Colorado (C-2) | Mueller Engineering Corp. | 1 | 0 | 11.1K | Apr 1994 – Jun 1998 |
| Armendaiz et AL G-4-150886 | Arroyo Colorado (B-7) | Mueller Engineering Corp. | 1 | 0 | 232K | Jul 1994 – Aug 1997 |
| — G-4-49292 | — | — | 0 | 0 | 0 | — |
| — G-4-49490 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mueller Engineering Corp.Jan 1993 → May 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 467299-99 | Recompletion | Mueller Engineering Corp. | Sep 8, 1997 | Sep 15, 1997 | Aug 5, 1997 | 2,596 |
| 426218-99 | Recompletion | Mueller Engineering Corp. | Aug 2, 1994 | Aug 4, 1994 | Jul 7, 1994 | 2,764 |
| 423105-99 | Recompletion | Mueller Engineering Corp. | Apr 18, 1994 | Apr 25, 1994 | Apr 8, 1994 | 4,115 |
| 400720-99 | Recompletion | Mueller Engineering Corp. | Jun 30, 1992 | Jul 3, 1992 | Aug 19, 1992 | 4,115 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-49292 | — | — | — | — |
| — | — G-4-49490 | — | — | — | — |
| — | — G-4-142596 | — | — | — | — |
| — | — G-4-149278 | — | — | — | — |
| — | — G-4-150886 | — | — | — | — |
| — | — G-4-164666 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 408 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 10 | 398 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,198 | 2,202 | Perforated |
| 2,590 | 2,592 | Perforated |
| 2,666 | 2,668 | Perforated |
| 2,942 | 2,944 | Perforated |
| 3,070 | 3,074 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 315 | 12.25 | 126 S |
| 8.625 | 315 | 12.5 | 126 S |
| 4.5 | 4,030 | 7.875 | 485 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 5, 1998 | Jun 29, 1998 | — |
| 00 | Oct 10, 1997 | Sep 4, 1997 | Yes |
| 00 | Oct 8, 1997 | — | — |
| 00 | Nov 14, 1994 | Jul 22, 1994 | Yes |
| 00 | Sep 13, 1994 | — | — |
| 00 | Jun 14, 1994 | Apr 18, 1994 | Yes |
| 00 | May 31, 1994 | — | — |
| 00 | Nov 18, 1992 | Sep 16, 1992 | Yes |
| 00 | Oct 27, 1992 | — | — |
| 00 | Jan 12, 1984 | Dec 2, 1970 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-30036 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-30036 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48930036, documented in the API reference.