WELL · 42-489-30054 · DISTRICT 4

Armendaiz Etal #5

Plugged

Willacy County · Arroyo Colorado (G-1) field  · Vertical

Armendaiz Etal #5 (API 42-489-30054) is a plugged well in Willacy County, plugged November 12, 1999, last operated by Petrotex Management CO..

The RRC has issued 3 drilling permits between 1978 and 1994, permitted to 4,000 ft.

It was permitted by Mueller Engineering Corp. and has since transferred to Petrotex Management CO. on the wellbore schedule.

Completion filings report one formation top, including Arroyo Colorado D-1.

Operator of record

Petrotex Management Co.

Permitted by Mueller Engineering Corp.; the EWA schedule now lists a different operator.

Corpus Chrsti, TX · P-5 Y, filed Jul 15, 1983 · 44 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrotex Management Co.
Production reportsMueller Engineering Corp.through Jan 1999
Latest permitMueller Engineering Corp.Dec 29, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
3
permits on file
Dec 29, 1994
last permit issued
Apr 11, 1971
completed
0
cumulative oil, bbl
357K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 11, 1971
Shut in
—
Plugged
Nov 12, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Armendaiz, et AL G-4-142585Arroyo Colorado (C-2)Mueller Engineering Corp.10117KJan 1993 – Nov 1999
Armendaiz, et AL G-4-152454Arroyo Colorado (B-4)Mueller Engineering Corp.10241KDec 1994 – Nov 1999
— G-4-50326——000—
— G-4-50535——000—
— G-4-77433——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jan 1993 → Jan 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431303-99RecompletionMueller Engineering Corp.Dec 23, 1994Dec 29, 1994Dec 1, 19942,900
400103-99RecompletionMueller Engineering Corp.Jun 11, 1992Jun 15, 1992Aug 31, 19923,120
26239-99RecompletionPetrotex Management Co.Jun 12, 1978Jun 12, 1978—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-50326————
—— G-4-50535————
—— G-4-77433————
—— G-4-142585————
—— G-4-152454————

Formation tops

As filed on W-2/G-1. Subsea from 13 ft elevation.Download CSV →

FormationMD ftSubsea
Arroyo Colorado D-13,038-3,025

Perforations

Perforated and open-hole intervals.

FromToType
2,5882,592Perforated
2,6662,668Perforated
2,6812,683Perforated
2,8802,900Perforated
2,9382,940Perforated
3,8863,897Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62532112.25225 S
8.62532112.5225 S
4.54,0527.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 25, 1998Jun 3, 1998—
00Mar 6, 1997Dec 10, 1996—
00Apr 18, 1995Dec 28, 1994Yes
00Jan 31, 1995——
00Nov 18, 1992Sep 18, 1992Yes
00Oct 27, 1992——
00Jan 12, 1984Jul 13, 1978—
00Jan 12, 1984May 24, 1971—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930054, documented in the API reference.