WELL · 42-489-30065 · DISTRICT 4
Armendaiz et AL #1
Willacy County · Arroyo Colorado (F-3) field · Vertical
Armendaiz ET AL #1 (API 42-489-30065) is a plugged well in Willacy County, plugged January 16, 1996, last operated by Petrotex Management CO..
The RRC has issued 2 drilling permits between 1980 and 1992, permitted to 4,063 ft.
It was permitted by Mueller Engineering Corp. and has since transferred to Petrotex Management CO. on the wellbore schedule.
Operator of record
Permitted by Mueller Engineering Corp.; the EWA schedule now lists a different operator.
Corpus Chrsti, TX · P-5 Y, filed Jul 15, 1983 · 44 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petrotex Management Co. |
| Production reports | Mueller Engineering Corp.through Oct 1995 |
| Latest permit | Mueller Engineering Corp.Jul 3, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,063
- total depth, ft
- 2
- permits on file
- Jul 3, 1992
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 84.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 16, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Armendiaz, et al "B" G-4-142587 | Arroyo Colorado (C-2) | Mueller Engineering Corp. | 1 | 0 | 84.7K | Jan 1993 – Jan 1996 |
| — G-4-89700 | — | — | 0 | 0 | 0 | — |
| — G-4-89701 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mueller Engineering Corp.Jan 1993 → Oct 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 400721-99 | Recompletion | Mueller Engineering Corp. | Jun 30, 1992 | Jul 3, 1992 | Aug 19, 1992 | 4,063 |
| 85494-99 | Recompletion | Petrotex Management Co. | Jun 30, 1980 | Jun 30, 1980 | — | 4,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-89700 | — | — | — | — |
| — | — G-4-89701 | — | — | — | — |
| — | — G-4-142587 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,938 | 2,940 | Perforated |
| 3,330 | 3,335 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 341 | 12.25 | 180 S |
| 2.375 | 3,383 | — | — |
| 4.5 | 4,050 | 7.875 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 1992 | Sep 18, 1992 | Yes |
| 00 | Oct 27, 1992 | — | — |
| 00 | Jan 12, 1984 | Sep 18, 1980 | — |
| 00 | Jan 12, 1984 | May 30, 1972 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-30065 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-30065 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48930065, documented in the API reference.