WELL · 42-489-30629 · DISTRICT 4

Sauz Ranch Mulatos Pasture #162

Plugged

Willacy County · Willamar (Graben a-1 Sd. N.) field  · Vertical

Sauz Ranch Mulatos Pasture #162 (API 42-489-30629) is a plugged well in Willacy County, plugged August 14, 1992, last operated by Chestnut Explor. And Prod. Inc..

The RRC has issued 2 drilling permits between 1980 and 1991, permitted to 8,400 ft.

It was permitted by Exxon Corp. and has since transferred to Chestnut Explor. And Prod. Inc. on the wellbore schedule.

Its 2 leases have reported 170K barrels of oil and 39.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Chestnut Explor. and Prod. Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 5 permits on file · (972) 342-7791

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChestnut Explor. and Prod. Inc.
Production reportsChestnut Explor. and Prod., Inc.through May 2017
Latest permitExxon Corp.Sep 26, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
2
permits on file
Sep 26, 1991
last permit issued
Mar 30, 1981
completed
170K
cumulative oil, bbl
39.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 30, 1981
Shut in
—
Plugged
Aug 14, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sauz Ranch Mulatos Pasture O-4-4287Willamar (Graben a-1 Sd., N.)Chestnut Explor. and Prod., Inc.7170K39.8KJan 1993 – Jul 2026
— G-4-140770——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Nov 1995
  2. 2Parker & Parsley Development L.PJan 1996 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  4. 4Prize Operating CompanyJul 1999 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → May 2011
  7. 7Flint Oak Energy, LLCJun 2011 → Jul 2014
  8. 8Chestnut Explor. and Prod., Inc.Aug 2014 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392255-99RecompletionExxon Corp.Sep 25, 1991Sep 26, 1991Oct 21, 19918,400
91751-99DrillExxon Corp.Sep 8, 1980Sep 8, 1980Oct 9, 19808,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-140770————
—— O-4-4287————

Perforations

Perforated and open-hole intervals.

FromToType
7,6647,672Perforated
7,8167,835Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,56612.25650 S
8.6251,56712.25650 S
2.3757,780——
5.57,9907.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 1992Feb 11, 1992Yes
00Mar 10, 1992——
00Jan 12, 1984Apr 24, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930629, documented in the API reference.