WELL · 42-489-30823 · DISTRICT 4

Sauz Ranch Mulatos Past. #182

Plugged

Willacy County · Willamar West (Miocene 6050 N) field  · Vertical

Sauz Ranch Mulatos Past. #182 (API 42-489-30823) is a plugged well in Willacy County, plugged August 12, 1993, last operated by Chestnut Explor. And Prod. Inc..

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 6,800 ft.

It was permitted by Exxon Corp. and has since transferred to Chestnut Explor. And Prod. Inc. on the wellbore schedule.

Its 2 leases have reported 6.25K barrels of oil and 5.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Chestnut Explor. and Prod. Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 5 permits on file · (972) 342-7791

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChestnut Explor. and Prod. Inc.
Production reportsPrize Operating Companythrough Mar 2000
Latest permitExxon Corp.May 20, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
2
permits on file
May 20, 1986
last permit issued
Jul 10, 1986
completed
6.25K
cumulative oil, bbl
5.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 10, 1986
Shut in
—
Plugged
Aug 12, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sauz Ranch Mulatos Past. O-4-10529Willamar, West (Miocene 6050,N)Chestnut Explor. and Prod., Inc.46.25K5.8KJan 1993 – Jul 2026
Sauz Ranch Mulatos Pasture O-4-9940Willamar, West (Miocene 5950)Cimarex Energy Co. of Colorado300Jan 1993 – Jun 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development L.PJul 1997 → Aug 1997
  2. 2Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  3. 3Prize Operating CompanyJul 1999 → Mar 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302313-99RecompletionExxon Corp.Apr 17, 1986May 20, 1986—6,800
246163-99DrillExxon Corp.Dec 7, 1984Jul 24, 1984Aug 9, 19846,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-9940————
—— O-4-10529————

Perforations

Perforated and open-hole intervals.

FromToType
5,2945,300Perforated
5,8865,890Perforated
5,9835,988Perforated
6,0846,088Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,56612.25783 S
8.6251,56612.5783 S
2.8756,4287.8751,170 S
2.8756,428——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 15, 1986Jul 31, 1986Yes
00Aug 8, 1986—Yes
00Jul 23, 1986Jul 14, 1986Yes
00Jul 19, 1986——
00Jun 10, 1985Apr 17, 1985—
00May 25, 1985——
00Mar 25, 1985Mar 12, 1985—
00Mar 21, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930823, documented in the API reference.