WELL · 42-489-30923 · DISTRICT 4
Thomas M. G. et AL #1
Willacy County · Tordilla-NC (L-90E) field · Vertical
Thomas M. G. ET AL #1 (API 42-489-30923) is a plugged well in Willacy County, plugged December 21, 2018, last operated by Xto Energy Inc..
The RRC has issued 2 drilling permits between 1989 and 2013, permitted to 15,300 ft.
Completion filings report one formation top, including Frio.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Sep 2016 |
| Latest permit | XTO Energy Inc.Feb 7, 2013 |
- 15,300
- total depth, ft
- 2
- permits on file
- Feb 7, 2013
- last permit issued
- Feb 7, 2013
- completed
- 0
- cumulative oil, bbl
- 6.77M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 7, 2013
- Shut in
- —
- Plugged
- Dec 21, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thomas, M. G. et AL G-4-270120 | Tordilla-NC (L-90E) | XTO Energy Inc. | 1 | 0 | 146K | Feb 2013 – Dec 2018 |
| Thomas, M.G. et AL G-4-133022 | Tordilla (M-50,E) | XTO Energy Inc. | 1 | 0 | 6.63M | Jan 1993 – Feb 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Jul 2002
- 3XTO Energy Inc.Apr 2008 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 756147-99 | Recompletion | XTO Energy Inc. | Feb 4, 2013 | Feb 7, 2013 | Jan 24, 2013 | 13,675 |
| 360628-99 | Drill | Exxon Corp. | Jun 21, 1989 | Jun 29, 1989 | — | 15,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-133022 | — | — | — | — |
| — | — G-4-270120 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 30 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,852 | 11,868 | Perforated |
| 12,508 | 12,524 | Perforated |
| 12,531 | 12,538 | Perforated |
| 13,280 | 13,352 | Perforated |
| 13,280 | 13,380 | Perforated |
| 13,368 | 13,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,426 | 17.5 | 1,950 S |
| 13.375 | 2,427 | 17.5 | 1,950 S |
| 9.625 | 10,533 | 12.25 | 2,150 S |
| 5.5 | 11,607 | 6.75 | 485 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2013 | Apr 11, 2013 | — |
| 00 | Sep 3, 2008 | May 12, 2008 | — |
| 00 | Sep 18, 2001 | Jul 23, 2001 | — |
| 00 | Mar 10, 1997 | Jan 13, 1997 | — |
| 00 | Feb 8, 1990 | Nov 21, 1989 | Yes |
| 00 | Jan 31, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-30923 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-30923 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48930923, documented in the API reference.