WELL · 42-489-30932 · DISTRICT 4

Kleberg R J Jr TR Stillman #76

Plugged

Willacy County · Tordilla (Deep Cons.) field  · Vertical

Kleberg R J JR TR Stillman #76 (API 42-489-30932) is a plugged well in Willacy County, plugged December 2, 2025, last operated by Eog Resources Inc..

The RRC has issued 3 drilling permits (amended once) between 1991 and 2014, permitted to 15,400 ft.

Completion filings report 6 formation tops, including Fleming, Anahuac, Frio, L71.

Operator of record

EOG Resources Inc.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Nov 2017
Latest permitEOG Resources, Inc.Mar 15, 2014
15,400
total depth, ft
4
permits on file
Mar 15, 2014
last permit issued
May 4, 2014
completed
0
cumulative oil, bbl
21.7M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 4, 2014
Shut in
—
Plugged
Dec 2, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kleberg, R J Jr TR Stillman G-4-275749Tordilla (Deep Cons.)EOG Resources, Inc.101.8MMay 2014 – Dec 2025
Kleberg, R. J. Jr. Tr. Stillman G-4-255091WildcatEOG Resources, Inc.100Mar 2010 – Jun 2014
Kleberg, R.J., Stillman Jr.tr. G-4-140638Tordilla (M-10)Exxon Mobil Corporation1019.9MJan 1993 – Mar 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2008
  3. 3EOG Resources, Inc.May 2014 → Nov 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
780158-99RecompletionEOG Resources, Inc.Feb 19, 2014Mar 15, 2014Mar 27, 201415,400
685820-99RecompletionExxon Mobil CorporationOct 6, 2009Oct 20, 2009Jan 20, 201015,400
389335-98DrillExxon Corp.Jan 13, 1992Jun 26, 1991Aug 1, 199115,400
389335-99DrillExxon Corp.Jun 25, 1991Jun 26, 1991—15,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-140638————
—— G-4-255091————
—— G-4-275749————

Formation tops

As filed on W-2/G-1. Subsea from 80 ft elevation.Download CSV →

FormationMD ftSubsea
Fleming3,630-3,550
Anahuac5,500-5,420
Frio5,700-5,620
L7111,700-11,620
M1012,800-12,720
M3013,200-13,120

Perforations

Perforated and open-hole intervals.

FromToType
11,78011,795Perforated
12,70612,740Perforated
12,70612,758Perforated
12,75012,758Perforated
12,76412,820Perforated
12,76412,836Perforated
12,83212,836Perforated
12,84412,904Perforated
12,85812,862Perforated
12,89012,904Perforated
13,22013,340Perforated
13,22613,233Perforated
13,24713,261Perforated
13,30213,316Perforated
13,43213,526Perforated
13,44013,447Perforated
13,51013,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
207720220 S
13.3752,49017.52,300 S
9.62510,37712.251,270 S
5.511,9716.751,625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 2015Jun 18, 2014—
00May 27, 2010Mar 17, 2010Yes
00Mar 23, 2010——
00Nov 1, 2005May 18, 2005—
00Apr 6, 1992Jan 14, 1992Yes
00Feb 27, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.