WELL · 42-489-30945 · DISTRICT 4

Kleberg R J Jr TR Stillman #86

Plugged

Willacy County · Tordilla (Deep Cons.) field  · Vertical

Kleberg R J JR TR Stillman #86 (API 42-489-30945) is a plugged well in Willacy County, plugged December 9, 2024, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits (amended once) between 1993 and 2009, permitted to 14,400 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Tordilla (L-27), L27, Tordilla (M-10), Tordilla (M-50).

Operator of record

EOG Resources Inc.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Jun 2024
Latest permitExxon Mobil CorporationSep 10, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,400
total depth, ft
3
permits on file
Sep 10, 2009
last permit issued
Feb 6, 2016
completed
0
cumulative oil, bbl
13M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 6, 2016
Shut in
—
Plugged
Dec 9, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kleberg, R J Jr TR Stillman G-4-150121Tordilla (M-10)EOG Resources, Inc.1010.1MFeb 1994 – Nov 2024
Kleberg, R J Jr TR Stillman G-4-261761Tordilla-NC (L-27E)EOG Resources, Inc.102.91MJul 2011 – Nov 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 1,200(-100%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Mar 1994 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2011
  3. 3EOG Resources, Inc.Feb 2016 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683215-99RecompletionExxon Mobil CorporationJul 17, 2009Sep 10, 2009May 6, 201114,400
411038-98DrillExxon Corp.Apr 12, 1994Apr 26, 1993Sep 9, 199314,400
411038-99DrillExxon Corp.Apr 26, 1993Apr 26, 1993—14,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-150121————
—— G-4-261761————

Formation tops

As filed on W-2/G-1. Subsea from 80 ft elevation.Download CSV →

FormationMD ftSubsea
Tordilla (L-27)11,249-11,169
L2711,250-11,170
Tordilla (M-10)12,578-12,498
Tordilla (M-50)13,801-13,721
Tordilla (L-27)——
Tordilla (M-10)——
Tordilla (M-50)——

Perforations

Perforated and open-hole intervals.

FromToType
11,23411,250Perforated
11,23411,340Perforated
12,67012,750Perforated
13,20413,272Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.8752,43517.51,652 S
9.62510,41312.253,810 S
5.512,068—856 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 23, 2016Aug 2, 2016—
00Jan 9, 2012Aug 1, 2011—
00Apr 25, 2001Mar 2, 2001—
00Sep 1, 1994Apr 15, 1994Yes
00Jul 27, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930945, documented in the API reference.