WELL · 42-489-30956 · DISTRICT 4

Kleberg R J Jr TR Stillman #103

Plugged

Willacy County · Tordilla (Deep Cons.) field  · Vertical

Kleberg R J JR TR Stillman #103 (API 42-489-30956) is a plugged well in Willacy County, plugged December 6, 2019, last operated by Eog Resources Inc..

The RRC has issued 3 drilling permits between 1994 and 2010, permitted to 13,800 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including I-95, L-27, N-27, M-10.

Operator of record

EOG Resources Inc.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Nov 2019
Latest permitExxon Mobil CorporationAug 11, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,800
total depth, ft
3
permits on file
Aug 11, 2010
last permit issued
Mar 5, 2010
completed
0
cumulative oil, bbl
21.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Apr 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 2010
Shut in
—
Plugged
Dec 6, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kleberg R J Jr TR Stillman G-4-256678Tordilla-NC (L-90E)—10515KMar 2010 – Apr 2020
Kleberg, R.j.jr.tr.stillman G-4-152675Tordilla (M-10)Exxon Mobil Corporation1021.1MNov 1994 – Mar 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.May 1995 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jan 2013
  3. 3EOG Resources, Inc.Feb 2013 → Nov 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
700482-99RecompletionExxon Mobil CorporationAug 10, 2010Aug 11, 2010Jan 19, 201013,800
689228-99RecompletionExxon Mobil CorporationDec 31, 2009Jan 5, 2010Jan 19, 201013,800
426120-99DrillExxon Corp.Jul 21, 1994Jul 21, 1994Sep 2, 199413,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-152675————
—— G-4-256678————

Formation tops

As filed on W-2/G-1. Subsea from 78 ft elevation.Download CSV →

FormationMD ftSubsea
I-958,994-8,916
I-958,997-8,919
L-2711,324-11,246
N-2711,324-11,246
M-1012,598-12,520

Perforations

Perforated and open-hole intervals.

FromToType
12,02012,050Perforated
12,05812,068Perforated
12,60012,720Perforated
12,72912,737Perforated
12,75212,759Perforated
13,12313,276Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,44817.51,770 S
9.62510,37512.252,675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 2010Mar 24, 2010Yes
00Jul 28, 2010——
00Aug 27, 2001Jun 27, 2001—
00Mar 29, 1995Feb 3, 1995Yes
00Feb 8, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930956, documented in the API reference.