WELL · 42-489-31101 · DISTRICT 4

Kleberg R J Jr TR Stillman #142

Plugged

Willacy County · Tordilla (Deep Cons.) field  · Vertical

Kleberg R J JR TR Stillman #142 (API 42-489-31101) is a plugged well in Willacy County, plugged June 27, 2024, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits between 2004 and 2008, permitted to 13,000 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including L-27, L-43, L-71.

Operator of record

EOG Resources Inc.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Oct 2020
Latest permitExxon Mobil CorporationApr 29, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Apr 29, 2008
last permit issued
May 24, 2008
completed
0
cumulative oil, bbl
3.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jun 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 24, 2008
Shut in
—
Plugged
Jun 27, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kleberg, R J Jr TR Stillman G-4-238515Tordilla (L-43)EOG Resources, Inc.102.07MMay 2008 – Jun 2024
Kleberg, R J Jr TR Stillman Past G-4-221332Tordilla (L-71)Exxon Mobil Corporation101.34MJun 2006 – May 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationJun 2006 → Apr 2012
  2. 2EOG Resources, Inc.Mar 2016 → Oct 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
659316-99RecompletionExxon Mobil CorporationApr 10, 2008Apr 29, 2008May 14, 200811,800
549497-99DrillExxon Mobil CorporationAug 12, 2004Aug 13, 2004Apr 7, 200613,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-221332————
—— G-4-238515————

Formation tops

As filed on W-2/G-1. Subsea from 53 ft elevation.Download CSV →

FormationMD ftSubsea
L-2711,405-11,352
L-4311,630-11,577
L-7111,790-11,737

Perforations

Perforated and open-hole intervals.

FromToType
11,50611,522Perforated
11,50711,523Perforated
11,53611,542Perforated
11,53711,543Perforated
11,79011,800Perforated
11,81011,814Perforated
11,81811,836Perforated
11,85011,858Perforated
11,89811,910Perforated
11,92811,942Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,47917.51,982 S
9.87510,35012.252,270 S
9.87510,35012.52,270 S
3.511,9346.51,078 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2008Jun 10, 2008Yes
00Sep 6, 2008——
00Apr 2, 2007Oct 31, 2006—
00Mar 8, 2007Jul 21, 2006Yes
00Nov 14, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48931101, documented in the API reference.