WELL · 42-489-31248 · DISTRICT 4
Kleberg R J Jr TR Stillman #503
Willacy County · Tordilla (Deep Cons.) field · Vertical
Kleberg R J JR TR Stillman #503 (API 42-489-31248) is a plugged well in Willacy County, plugged June 13, 2019, last operated by Eog Resources Inc..
The RRC has issued 2 drilling permits (amended once) in 2010, permitted to 16,000 ft.
Completion filings report 3 formation tops, including L27, M10, M30.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Jul 2018 |
| Latest permit | EOG Resources, Inc.Nov 23, 2010 |
- 16,000
- total depth, ft
- 3
- permits on file
- Nov 23, 2010
- last permit issued
- Jun 14, 2011
- completed
- 0
- cumulative oil, bbl
- 286K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jun 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 2011
- Shut in
- —
- Plugged
- Jun 13, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kleberg, R J Jr TR Stillman G-4-264652 | Tordilla-NC (L-27E) | EOG Resources, Inc. | 1 | 0 | 286K | Jun 2011 – Jun 2019 |
| Kleberg, R J Jr TR Stillman G-4-260272 | Tordilla (M-10) | EOG Resources, Inc. | 1 | 0 | 0 | Oct 2010 – Jun 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Jul 2011 → Jul 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705723-99 | Recompletion | EOG Resources, Inc. | Nov 19, 2010 | Nov 23, 2010 | Jul 12, 2010 | 16,000 |
| 695376-98 | Drill | EOG Resources, Inc. | May 4, 2010 | May 4, 2010 | Jul 12, 2010 | 16,000 |
| 695376-99 | Drill | EOG Resources, Inc. | May 3, 2010 | May 4, 2010 | — | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-260272 | — | — | — | — |
| — | — G-4-264652 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 40 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| L27 | 11,330 | -11,290 |
| M10 | 12,670 | -12,630 |
| M30 | 13,070 | -13,030 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,328 | 12,826 | Perforated |
| 12,784 | 12,826 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,528 | 17.5 | 1,821 S |
| 9.625 | 10,432 | 12.25 | 890 S |
| 3.5 | 13,484 | 5.125 | 150 S |
| 3.5 | 13,484 | 5.5 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 12, 2012 | Jul 19, 2011 | Yes |
| 00 | Jul 18, 2011 | Nov 15, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-31248 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-31248 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48931248, documented in the API reference.