WELL · 42-493-31580 · DISTRICT 1

Eschenburg R.L. II et. a Al. #2H

Plugged

Wilson County · Marcelina Creek (Buda) field  · Horizontal

Eschenburg R.L. II ET. A AL. #2H (API 42-493-31580) is a plugged horizontal well in Wilson County, plugged July 14, 2020, last operated by Jena Operating Company Inc..

The RRC has issued 3 drilling permits between 1984 and 1997, permitted to 9,000 ft.

It was permitted by Pedeco, Inc. and has since transferred to Jena Operating Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Carrizo, Poth, Lit, Austin Chalk.

Its 2 leases have reported 15.5K barrels of oil and 2.46K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Jena Operating Company Inc.

Permitted by Pedeco, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Aug 1, 1997 · 19 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJena Operating Company Inc.
Production reportsLPG Energy Companythrough Dec 1996
Latest permitPedeco, Inc.Oct 23, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Oct 23, 1997
last permit issued
Aug 17, 1984
completed
15.5K
cumulative oil, bbl
2.46K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 17, 1984
Shut in
—
Plugged
Jul 14, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eschenburg, et al Unit O-1-13569Marcelina Creek (Austin Chalk)Aerie Energy115.5K2.46KJan 1993 – Jul 2026
— O-1-9876——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jena Operating Company, Inc.Jan 1993 → Aug 1993
  2. 2Penrod Oil Company of Texas, IncSep 1993 → Dec 1993
  3. 3Lucros International CorporationJan 1994 → Apr 1995
  4. 4LPG Energy CompanyAug 1996 → Dec 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
469208-99RecompletionPedeco, Inc.Oct 23, 1997Oct 23, 1997Dec 28, 19979,000
398399-99RecompletionJena Operating Company, Inc.Apr 14, 1992Apr 14, 1992May 30, 19926,350
241100-99DrillTexlark Exploration Company, IncMay 25, 1984Jun 5, 1984Jul 18, 19846,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-9876————
—— O-1-13569————

Formation tops

As filed on W-2/G-1. Subsea from 367 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo1,485-1,118
Poth3,950-3,583
Lit5,268-4,901
Austin Chalk6,196-5,829
Eagle FordEAGLEFORD6,436-6,069
Eagle FordEAGLEFORD SHALE6,436-6,069
Buda6,482-6,115

Perforations

Perforated and open-hole intervals.

FromToType
6,1087,397Perforated
6,2187,416Perforated
6,4736,485Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62577412.25225 sx
5.56,4737.875665 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 28, 1998Apr 6, 1998Yes
00Jul 23, 1992Jun 24, 1992—
00Jul 17, 1992—Yes
00Sep 5, 1984Aug 23, 1984—
00Sep 1, 1984Aug 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49331580, documented in the API reference.