WELL · 42-493-31632 · DISTRICT 1

Trappe -A- #2H

N

Wilson County · Marcelina Creek (Austin Chalk) field  · Horizontal

Trappe -A- #2H (API 42-493-31632) is a horizontal well in Wilson County operated by First Light Operating LLC, completed December 17, 1984.

The RRC has issued 3 drilling permits (amended once) between 1984 and 2007, permitted to 7,600 ft.

It was permitted by First Rock, Inc. and has since transferred to First Light Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Austin Chalk, Eagle Ford, Buda.

Its lease has reported 28.6K barrels of oil and 8.19K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

First Light Operating LLC

Permitted by First Rock, Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Apr 4, 2026 · (512) 461-8418

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFirst Light Operating LLC
Production reportsFirst Rock, Inc.through Oct 2011
Latest permitFirst Rock, Inc.Oct 19, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
4
permits on file
Oct 19, 2007
last permit issued
Dec 17, 1984
completed
28.6K
cumulative oil, bbl
8.19K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 17, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Trappe -A- O-1-10112Marcelina Creek (Austin Chalk)First Light Operating, LLC228.6K8.19KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1First Rock, Inc.Feb 2006 → Oct 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
647448-98RecompletionFirst Rock, Inc.Dec 11, 2007Oct 19, 2007Oct 20, 20077,500
647448-99RecompletionFirst Rock, Inc.Oct 9, 2007Oct 19, 2007—7,500
608287-99RecompletionFirst Rock, Inc.Oct 21, 2005Oct 25, 2005Jan 16, 20067,500
255305-99DrillRGR ProductionOct 22, 1984Oct 22, 1984Oct 29, 19847,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10112————
—— O-1-10112————

Formation tops

As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho6,955-6,615
Austin Chalk7,081-6,741
Austin ChalkAUSTIN7,085-6,745
Eagle FordEAGLEFORD7,340-7,000
Buda7,431-7,091

Perforations

Perforated and open-hole intervals.

FromToType
6,7888,822Perforated
7,0818,590Perforated
7,2097,348Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,01412.25700 S
5.57,5287.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 2008Mar 13, 2008Yes
00Jan 3, 2007Feb 23, 2006Yes
00Mar 30, 2006——
00Jan 14, 1985Jan 5, 1985—
00Jan 9, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49331632, documented in the API reference.