WELL · 42-493-31910 · DISTRICT 1

Schiffers Ranch #1

N

Wilson County · Marcelina Creek (Buda) field  · Vertical

Schiffers Ranch #1 (API 42-493-31910) is a well in Wilson County operated by Loma Vista Farms, completed May 23, 1986.

The RRC has issued 2 drilling permits between 1986 and 1990, permitted to 7,500 ft.

It was permitted by Watco Energy, Inc. and has since transferred to Loma Vista Farms on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.

Its 2 leases have reported 121K barrels of oil and 16.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Loma Vista Farms

Permitted by Watco Energy, Inc.; the EWA schedule now lists a different operator.

Floresville, TX · P-5 Y, filed Oct 4, 2019 · 1 permits on file · (830) 393-2397

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLoma Vista Farms
Production reportsFirst Light Operating, LLCthrough Apr 2026
Latest permitWatco Energy, Inc.Nov 6, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Nov 6, 1990
last permit issued
May 23, 1986
completed
121K
cumulative oil, bbl
16.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 23, 1986
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
LVF Schiffers O-1-11969Marcelina Creek (Austin Chalk)First Light Operating, LLC5121K16.1KJan 1993 – Jul 2026
Schiffers Ranch O-1-11522Marcelina Creek (Buda)Loma Vista Farms400Jan 1993 – Oct 2003

Oil, barrels lease total

Last 12 months 14,829 · prior 12 10,742(+38%)

01K2K202420252026

Gas, mcf lease total

Last 12 months 4,436 · prior 12 3,050(+45%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Watco Energy, Inc.Jan 1993 → Nov 1993
  2. 2Loma Vista FarmsDec 1993 → Jun 2019
  3. 3First Rock, Inc.Jul 2019 → Jun 2025
  4. 4First Light Operating, LLCJul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
379175-99RecompletionWatco Energy, Inc.Oct 9, 1990Nov 6, 1990—7,310
300406-99DrillWatco Energy, Inc.Mar 28, 1986Mar 28, 1986May 7, 19867,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-11522————
—— O-1-11969————

Formation tops

As filed on W-2/G-1. Subsea from 424 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,720-6,296
Eagle Ford7,210-6,786
Eagle FordEAGLEFORD7,210-6,786
Buda7,260-6,836

Perforations

Perforated and open-hole intervals.

FromToType
7,0407,050Perforated
7,2257,230Perforated
7,2797,289Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62580112.25314 S
8.62580112.5314 S
5.57,3097.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 18, 1990Nov 19, 1990Yes
00Dec 11, 1990Feb 17, 1987Yes
00Mar 2, 1987Feb 17, 1987Yes
00Jun 9, 1986Jun 3, 1986Yes
00Jun 6, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49331910, documented in the API reference.