WELL · 42-493-32029 · DISTRICT 2

Stanley Unit #1

Plugged

Wilson County · Patton (Austin Chalk) field  · Vertical

Stanley Unit #1 (API 42-493-32029) is a plugged well in Wilson County, plugged February 19, 2009, last operated by Tejones Operating Corporation.

The RRC has issued one drilling permit (amended once), issued October 3, 1988, permitted to 7,900 ft.

It was permitted by Black Gold Operating CO., Inc. and has since transferred to Tejones Operating Corporation on the wellbore schedule.

Completion filings report 5 formation tops, including Austin Chalk, Eagle Ford, Buda, Del Rio.

Its lease has reported 2.27K barrels of oil and 881 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Tejones Operating Corporation

Permitted by Black Gold Operating Co., Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Aug 8, 2014 · 13 permits on file · (210) 601-5614

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTejones Operating Corporation
Production reportsTejones Operating Corporationthrough Apr 2007
Latest permitBlack Gold Operating Co., Inc.Oct 3, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
2
permits on file
Oct 3, 1988
last permit issued
Apr 12, 1990
completed
2.27K
cumulative oil, bbl
881
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 12, 1990
Shut in
—
Plugged
Feb 19, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stanley Unit O-2-7485Patton (Austin Chalk)Tejones Operating Corporation22.27K881Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1A & a Production Co.Jan 1993 → Mar 1993
  2. 2Nutek Oil IncApr 2004 → Jan 2005
  3. 3Titan Consolidated, Inc.Feb 2005 → Mar 2005
  4. 4Titan Oil and Gas, Inc.Apr 2005 → Aug 2006
  5. 5Tejones Operating CorporationSep 2006 → Apr 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
337278-98DrillBlack Gold Operating Co., Inc.Jan 30, 1989Oct 3, 1988—7,900
337278-99DrillBlack Gold Operating Co., Inc.Oct 13, 1987Oct 3, 1988—7,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-7485————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Austin Chalk7,112
Austin Chalk7,187
Eagle FordEAGLEFORD SHALE7,400
BudaBUDA LIME7,520
Del RioDEL RIO SHALE7,583
GeorgetownGEORGETOWN LIME7,616

Perforations

Perforated and open-hole intervals.

FromToType
7,1127,122Perforated
7,2937,306Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62580212.25249 S
4.57,5467.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 8, 1990May 2, 1990—
00Aug 18, 1989Jun 27, 1989Yes
00Aug 17, 1989Jan 16, 1989—
00Aug 12, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332029, documented in the API reference.