WELL · 42-493-32290 · DISTRICT 1
Mattke O. #1
Wilson County · LA Vernia (Austin Chalk) field · Vertical
Mattke O. #1 (API 42-493-32290) is a plugged well in Wilson County, plugged July 27, 1998, last operated by Seguro Well Service Inc..
The RRC has issued one drilling permit (amended once), issued May 23, 1991, permitted to 2,990 ft.
It was permitted by Rollert CO., Inc., The and has since transferred to Seguro Well Service Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Navarro, Taylor, Pecan Gap, Austin Chalk.
Its lease has reported 223 barrels of oil and 8 mcf of gas since January 1993, last reporting in September 1998.
Operator of record
Permitted by Rollert Co., Inc., The; the EWA schedule now lists a different operator.
Gonzales, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (830) 857-4042
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seguro Well Service Inc. |
| Production reports | Cannan, Morristhrough May 1994 |
| Latest permit | Rollert Co., Inc., TheMay 23, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,990
- total depth, ft
- 2
- permits on file
- May 23, 1991
- last permit issued
- Jun 27, 1991
- completed
- 223
- cumulative oil, bbl
- 8
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 27, 1991
- Shut in
- —
- Plugged
- Jul 27, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mattke, O. O-1-13121 | LA Vernia (Austin Chalk) | Seguro Well Service, Inc. | 1 | 223 | 8 | Jan 1993 – Sep 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cannan, MorrisJan 1993 → May 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 388230-98 | Drill | Rollert Co., Inc., The | Jul 5, 1991 | May 23, 1991 | — | 2,990 |
| 388230-99 | Drill | Rollert Co., Inc., The | May 23, 1991 | May 23, 1991 | Jun 2, 1991 | 2,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-13121 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 450 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 1,760 | -1,310 |
| Taylor | 2,110 | -1,660 |
| Pecan Gap | 2,580 | -2,130 |
| Austin Chalk | 2,870 | -2,420 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,873 | 2,874 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 2,945 | 7.875 | 405 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 22, 1991 | Jun 12, 1991 | Yes |
| 00 | Jul 19, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32290 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32290 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332290, documented in the API reference.