WELL · 42-493-32378 · DISTRICT 1

Scull C. E. Jr. G #6

Plugged

Wilson County · LA Vernia field  · Vertical

Scull C. E. JR. G #6 (API 42-493-32378) is a plugged well in Wilson County, plugged October 7, 2022, last operated by Metco Oil Corporation.

The RRC has issued 2 drilling permits between 1993 and 1997, permitted to 1,000 ft.

Completion filings report one formation top, including Poth.

Its 2 leases have reported 67.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

Metco Oil Corporation

Seguin, TX · P-5 Y, filed Jul 8, 2016 · 55 permits on file · (830) 305-5442

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMetco Oil Corporation
Production reportsENERGON3through Aug 2017
Latest permitMetco Oil CorporationNov 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
2
permits on file
Nov 7, 1997
last permit issued
Jul 9, 1993
completed
67.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 9, 1993
Shut in
—
Plugged
Oct 7, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
C.e.scull,jr.-G- O-1-14142Glenn Poth (Poth Sand)Elam Oil Company LLC636.7K0Oct 1997 – Jul 2026
Scull, C. E. Jr. "G" O-1-12786LA VerniaMetco Oil Corporation431.1K21Jan 1993 – Dec 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Glenco Oil & Gas CompanyJan 1993 → Dec 1994
  2. 2Metco Oil CorporationJan 1995 → Sep 2015
  3. 3ENERGON3Nov 2015 → Aug 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
469614-99Field transferMetco Oil CorporationNov 3, 1997Nov 7, 1997Apr 22, 19931,000
410693-99DrillGlenco Oil & Gas CompanyApr 13, 1993Jul 5, 1993Apr 22, 19931,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12786————
—— O-1-14142————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Poth936
Poth937

Perforations

Perforated and open-hole intervals.

FromToType
936940Perforated
937940Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,0456.75163 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 8, 2002Jan 4, 2002—
00Dec 30, 1997Dec 16, 1997—
00Dec 15, 1997Jul 10, 1993Yes
00Aug 9, 1993Jul 10, 1993Yes
00Aug 3, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
437K
bbl, all reported
Nov 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090446H-1 InjectionPlugged Dec 21, 2022300450937–940

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 7,030(-100%)

05001K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332378, documented in the API reference.