WELL · 42-493-32383 · DISTRICT 1

Psencik Unit #1

Plugged

Wilson County · Kelly Lynne (Anachcho) field  · Directional

Psencik Unit #1 (API 42-493-32383) is a plugged well in Wilson County, plugged March 5, 2007, last operated by Prevail Energy Incorporated.

The RRC has issued one drilling permit (amended 3 times), issued July 9, 1993, permitted to 5,400 ft.

It was permitted by Texlark Exploration Company, Inc and has since transferred to Prevail Energy Incorporated on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Top Poth Sand, Anacacho.

Its lease has reported 83.8K barrels of oil and 990 mcf of gas since September 1993, last reporting in July 2026.

Operator of record

Prevail Energy Incorporated

Permitted by Texlark Exploration Company, Inc; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed May 29, 2025 · 3 permits on file · (361) 779-1538

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrevail Energy Incorporated
Production reportsLynd, J. L., Inc.through Aug 2000
Latest permitTexlark Exploration Company, IncJul 9, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,400
total depth, ft
4
permits on file
Jul 9, 1993
last permit issued
May 1, 1996
completed
83.8K
cumulative oil, bbl
990
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 1, 1996
Shut in
—
Plugged
Mar 5, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Psencik Unit O-1-13809Kelly Lynne (Anachcho)Prevail Energy, Incorporated183.8K990Sep 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texlark Exploration Company, IncSep 1993 → Apr 1998
  2. 2Wimmer Oil & Gas Co.May 1998 → Mar 1999
  3. 3Lynd, J. L., Inc.Jun 1999 → Aug 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413692-96DrillTexlark Exploration Company, IncNov 1, 1993Jul 9, 1993Jul 14, 19934,865
413692-97DrillTexlark Exploration Company, IncAug 26, 1993Jul 9, 1993—5,400
413692-98DrillTexlark Exploration Company, IncJul 13, 1993Jul 9, 1993—5,400
413692-99DrillTexlark Exploration Company, IncJul 9, 1993Jul 9, 1993—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13809————

Formation tops

As filed on W-2/G-1. Subsea from 476 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE WILCOX2,710-2,234
Top Poth Sand2,730-2,254
Anacacho4,702-4,226
AnacachoTOP ANACACHO4,702-4,226

Perforations

Perforated and open-hole intervals.

FromToType
4,7744,789Perforated
4,860—Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,30612.5450 S
4.54,8607.875680 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 3, 1996May 13, 1996—
00Jan 27, 1994Oct 8, 1993Yes
00Dec 14, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332383, documented in the API reference.