WELL · 42-493-32389 · DISTRICT 1

J W Unit #2 #2

Plugged

Wilson County · Pandora NW (Austin Chalk) field  · Vertical

J W Unit #2 #2 (API 42-493-32389) is a plugged well in Wilson County, plugged June 23, 2014, last operated by Lambeck Petroleum LLC.

The RRC has issued one drilling permit, issued October 20, 1993, permitted to 5,400 ft.

It was permitted by P.S.N. Petroleum, Inc. and has since transferred to Lambeck Petroleum LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Wilcox, Midway, Navarro, Taylor.

Its 3 leases have reported 46.6K barrels of oil and 5.39K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Lambeck Petroleum LLC

Permitted by P.S.N. Petroleum, Inc.; the EWA schedule now lists a different operator.

Stockdale, TX · P-5 Y, filed Jan 5, 2026 · (830) 391-0945

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLambeck Petroleum LLC
Production reportsAlcor Energy, Inc.through Jan 2006
Latest permitP.S.N. Petroleum, Inc.Oct 20, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,400
total depth, ft
1
permits on file
Oct 20, 1993
last permit issued
Dec 10, 1993
completed
46.6K
cumulative oil, bbl
5.39K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 10, 1993
Shut in
—
Plugged
Jun 23, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
J W Unit O-1-13566Pandora, NW (Austin Chalk)Alcor Energy, Inc.241.9K8Jan 1993 – Jul 2026
J W Unit #2 O-1-13888Pandora, NW (Austin Chalk)Lambeck Petroleum, LLC14.68K5.38KDec 1993 – Jul 2026
J W Unit # 2 O-1-13874Pandora, NW (Austin Chalk)P.S.N. Petroleum, Inc.100Dec 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1P.S.N. Petroleum, Inc.Jan 1993 → Jul 1997
  2. 2Alcor Energy, Inc.Oct 2001 → Jan 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
417144-99DrillP.S.N. Petroleum, Inc.Oct 15, 1993Oct 20, 1993Nov 21, 19935,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13566————
—— O-1-13874————
—— O-1-13888————

Formation tops

As filed on W-2/G-1. Subsea from 436 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxLOWER WILCOX1,638-1,202
Midway2,674-2,238
Navarro3,415-2,979
Taylor4,175-3,739
Anacacho4,624-4,188
Anacaho4,624-4,188
Austin Chalk4,836-4,400

Perforations

Perforated and open-hole intervals.

FromToType
4,9354,980Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,36112.25545 S
4.54,9357.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 1, 1994Aug 29, 1994—
00Oct 21, 1994Aug 29, 1994—
00Sep 26, 1994Jul 19, 1994Yes
00Sep 7, 1994Aug 26, 1994—
00Aug 26, 1994——
00Aug 2, 1994Jul 13, 1994—
00Jul 25, 1994——
00Jul 20, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332389, documented in the API reference.