WELL · 42-493-32442 · DISTRICT 1
Kevin Unit #1
Wilson County · Nixon field · NO Production · Horizontal
Kevin Unit #1 (API 42-493-32442) is a horizontal well in Wilson County operated by Royko Oil Company, completed August 7, 1996 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued June 24, 1996, permitted to 5,500 ft.
It was permitted by Texlark Exploration Company, Inc and has since transferred to Royko Oil Company on the wellbore schedule.
Completion filings report one formation top, including Anacacho.
Its lease has reported 55.7K barrels of oil and 1.05K mcf of gas since August 1996, last reporting in July 2026.
Operator of record
Permitted by Texlark Exploration Company, Inc; the EWA schedule now lists a different operator.
Horseshoe Bay, TX · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (210) 306-0300
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royko Oil Company |
| Production reports | Royko Oil Companythrough Feb 2013 |
| Latest permit | Texlark Exploration Company, IncJun 24, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- Jun 24, 1996
- last permit issued
- Aug 7, 1996
- completed
- 55.7K
- cumulative oil, bbl
- 1.05K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 7, 1996
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kevin Unit O-1-14069 | Nixon | Royko Oil Company | 1 | 55.7K | 1.05K | Aug 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texlark Exploration Company, IncAug 1996 → Apr 1998
- 2Wimmer Oil & Gas Co.May 1998 → Apr 1999
- 3Lynd, J. L., Inc.Jun 1999 → Dec 2004
- 4Royko Oil CompanyJan 2005 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 449562-99 | Drill | Texlark Exploration Company, Inc | Jun 21, 1996 | Jun 24, 1996 | Jul 9, 1996 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14069 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 454 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 4,642 | -4,188 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,676 | 5,314 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 566 | 12.75 | 160 S |
| 5.5 | 4,665 | 7.875 | 540 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 1996 | Aug 21, 1996 | Yes |
| 00 | Sep 30, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32442 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32442 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332442, documented in the API reference.